1.5. START-UP (fig. 1 and 3)
1.
Check that the installation has been carried out properly.
2.
Turn the switch S to ON.
3.
By opening the tap that we have connected to a ¾ ”outlet, feed water. A level switch will activate when
the appropriate height is reached and at that moment the green indicator L1 illuminates and remains so
for the duration of the distillation.
4.
Distilled water is collected in tank A and when it is filled, a level switch detects it by activating a solenoid
valve that closes the water inlet avoiding overflow; at that moment the heater is disconnected, stopping
the overheating of the equipment; L1 will switch off.
5.
Open the tap B in order to deliver distilled water.
1.6. MAINTENANCE (fig. 1, 3 and 4)
1.
With switch S in the OFF position; and the CA cable disconnected from the mains, remove the upper lid
of the water still.
2.
Remove the lid from the boiler EB.
3.
Open tap G located on the right, draining the boiler completely. When the water stops coming out, close
the tap.
4.
Pour in hydrochloric acid until it comes out through the drain D. It should be acting for 15 minutes.
5.
Open the tap G to drain the boiler, allowing all the liquid to flow out.
6.
Rinse with plenty of water and close the tap G.
7.
Repeat if necessary from step 4.
8.
Carry out a distillation that must be discarded.
1.7. SPARE PARTS
Description
Symbol
Cat. Number
Qty.
Contactor 230 V
C1
YE.DCONT00011
1
Electrovalve 230 V
E
YE.DELEC00002
1
Thermostat
T
YE.DTERM00001
1
Metallic heater 230 V
R1, R2
YE.DRDES00220
2
Metallic level switch, bent
Nd
YE.DSONI00002
1
Metallic level switch, straight
Ne
YE.DSONI00003
1
Flow regulator box
---
YP.DCAJA00002
1
Flow regulator 1.4 L/M
---
YP.DRECA00004
1
Warning: always disconnect the power supply before cleaning