PMB Quick Access Erection Manual Download Page 7

7

Step 11

: Fit diagonal braces

and toe board as shown.

Dismantling: - Reverse the steps of assembly.
Be sure to unlock the guardrail braces at the
end of the tower opposite the hatch platform
but leaving them in position. Then, return to
the seated position in the hatch platform before
unlocking the other ends and removing the
guardrail braces.

SINGLE WIDTH ERECTION STEP

Step 10

: Using 3T method, fit 4

horizontal braces as illustrated.

NOTE: Repeat Step 6 to 9 until
desired platform height is
achieved and then follow
step 10.

DISTRIBUTED BY:

PMB QUICK ACCESS SDN BHD. (516692-V)

Lot 1797,Jalan Balakong,Bukit Belimbing,
43300 Seri Kembangan,Selangor D.E.
Malaysia

Tel : +603-8961 8355
Fax : +603-8961 1904
Email : [email protected]
Website : www.qaccess-scaffolds.com

SINGLE WIDTH LADDER SIDE

PART DETAIL

Horizontal Brace

Single Width
4 Rung Ladder
Side

Single Width
2 Rung Ladder
Side

Single Width
4 Rung Normal
Side

Hatch Platform

Single Width
2 Rung Normal
Side

Stabilizer Bar

Toe Board

Castor

Diagonal Brace

Step 9

: Place hatch platform

and fit diagonal braces as
shown.

DOUBLE WIDTH LADDER SIDE

PART DETAIL

Horizontal Brace

Double Width
4 Rung Ladder
Side

Stabilizer Bar

Double Width
2 Rung Ladder
Side

Castor

Diagonal Brace

Double Width
4 Rung Normal
Side

Double Width
2 Rung Normal
Side

Hatch Platform

Fix Platform

Toe Board

Summary of Contents for Quick Access

Page 1: ...harness when the maximum drop or free fall heights is 1 8m from ground to the working level The usage of safety harness with double lanyard is strongly recommended Always make sure the safety harness...

Page 2: ...nsult your supplier It is not permissible to attach and use hoisting arrangement on towers unless specification provided by design Lifting Equipment Tower component should be firmly secured by reliabl...

Page 3: ...not let parts fall to the ground Such abuse may reduce the structure integrity and load capacity of the equipment In the event of damage the defective equipment must only be repaired by the qualified...

Page 4: ...SW DW SW DW SW DW SW DW SW DW SW DW SW DW SW DW SW 104kg 112kg 119kg 115kg 132kg 140kg 119kg 126kg 134kg 127kg 134kg 143kg 140kg 147kg 158kg 4 RUNG LADDER DW DOUBLE WIDTH LADDER SIDE SW SINGLE WIDTH L...

Page 5: ...ustable leg until there is no inclination from vertical Step 4 Place 4 rung frames secure them with frame clips Fit diagonal braces as illustrated Step 5 Locate stabilizers to each corners as shown an...

Page 6: ...he frame resting on the first horizontal tube Ensure the brace trigger is facing to the outside of the tower Step 3 Fit the normal side frame to the brace hook resting on the opposite horizontal rung...

Page 7: ...516692 V Lot 1797 Jalan Balakong Bukit Belimbing 43300 Seri Kembangan Selangor D E Malaysia Tel 603 8961 8355 Fax 603 8961 1904 Email sales qaccess scaffolds com Website www qaccess scaffolds com SING...

Reviews: