0000104046
/150915/0 MultiDust Bank COMPACT
EN - 7
ATTENTION
Service, maintenance and repairs must be
performed in accordance with directive TRGS 560
and TRGS 528 by authorised, qualified and trained
persons (skilled) using appropriate work practices.
ATTENTION
Before you carry out out service, maintenance and/
or repair jobs:
- fully disconnect the unit from the mains
- disconnect the compressed air supply
- de-energize the connected external device
Personal protective equipment (PPE)
Wear respiratory protection and protective
gloves during service, maintenance and
repairs.
WARNINg
The industrial vacuum cleaner that you use during
service and maintenance must meet dust class H
according to EN 60335-2-69 or HEPA class
(efficiency ≥99.97% at 0.3 µm).
4
INSTALLATION
4.1
Tools and requirements
You need the following tools and requirements to install the
unit:
- lifting equipment, e.g. a fork-lift truck or crane
- lifting gear (refer to section 4.3)
- basic tools
4.1.1 To be sourced locally
- Start/stop device (refer to section 4.6.2)
- Non return valve (refer to section 4.9)
- Ductwork to connect the unit with the external device
- Connection wires (refer to section 4.6)
- Compressed air regulator (in case you have not selected a
CAR-KIT)
- Compressed air hose Ø 8 mm (L=3 m/10 ft)
In case of PRECO-N (precoat):
- inspection hatch (refer to section 4.8)
In case of connection voltage 575V/3ph/60Hz:
- option: frequency inverter (refer to section 1.4.1)
To meet the IFA W3 certification requirements:
- strobe light (refer to section 4.6.1)
4.2
Unpacking
Make sure that the product is complete. The package must
contain:
- MDB-COMPACT (pre-assembled)
- square key (to lock/unlock the dust drawer)
- screw stud (4) + locknut M10 (4)
- FilterControl panel
- double-bit key (to lock/unlock the FilterControl panel)
4.3
Lifting
The unit can be lifted by chains, straps or cables.
Refer to section 1.5 for the weight of the units.
ATTENTION
To safely lift the unit, obey the instructions that
follow.
- Use all four eye bolts.
- Make sure that the lifting gear is correctly
attached.
- Lift the unit in fully horizontal position. If not
level: adjust the chain/strap/cable length.
- Angle of chains/straps/cables: max. 45°.
- Do not add any additional mass on the unit (e.g.
parts, tools).
- Do not walk under the suspended load.
- Use lifting equipment and procedures that comply
with the federal, state or local directives.
• Refer to Fig. IV on page 90 for detailed lifting
instructions.
4.4
Positioning
Mounting possibilities:
- on the floor
- on a platform
- on a frame
WARNINg
Before you install the unit, make sure that the
foundation is strong enough. Refer to section 1.5 for
the weight of the unit.
• Use a lifting device to bring the unit to the working area.
• Lift the unit to its final position. To safely install the unit,
obey the lifting instructions of section 4.3.
Mounting on the floor
• Make sure that the unit is level.
If necessary, use shims to make the unit level.
ATTENTION
To make the unit level, make sure that you support
the angular points as well as the seam between the
filter housing (A) and the fan housing (B).
A
B
C
A
B
C
C
C
C
F
C
D
E
G
(M10x25)
C
A
B
6 support points (bottom view)
Mounting on a platform or frame
If the unit is placed on a platform or frame, it must be
attached to this device.
Refer to Fig. V on page 91 for the hole pattern
and external dimensions of the unit.
The package contains 4 screw studs 100 mm (3.9 in.) with 4
locknuts.