
– 6 –
Fig. 5
• Place the copyboard on the lower brackets.
• Mark the board plate fitting hole positions on the wall.
• Lower the copyboard, drill pilot holes for anchor screws at the board plate fitting hole
positions marked on the wall, and install the anchor screws.
• When the copyboard is installed do not press it strongly against the wall, etc.
The fluorescent tub, etc. inside the copyboard may be damaged.
5. Mark the board plate fitting hole positions on the wall. (Fig. 5)
6. Place the copyboard on the lower brackets and fit the upper brackets to the wall. (Fig. 5)
Anchor position
Anchor screw
– 7 –
Pipe cap
Pipe cap
Fig. 6
Note: After the copyboard is installed, check the integrity of the mounting by applying
light force to the copyboard to confirm that is sufficiently mounted
7. Install the pipe cap at the right and left of the copyboard. (Fig, 6)