![Plumbline Progetto CL225.316 Installation Instructions Download Page 2](http://html1.mh-extra.com/html/plumbline/progetto-cl225-316/progetto-cl225-316_installation-instructions_1568645002.webp)
INSTALLATION INSTRUCTIONS
COASTAL OUTDOOR SHOWER COLUMN
| CL225.316
Before your installation
1. WARNING
Read all the instructions completely proceeding. Plumbline recommends calling a professional if you are uncertain about installing this
product!
This product should be installed in accordance with all local and state plumbing and building codes.
2.SHUT OFF WARER SUPPLY
Locate water supply inlets and shut
off
the water supply valves. These are usually found near the water meter. If you are replacing an
existing unit, remove the old unit and clean the mounting surface thoroughly.
3. TOOL RECOMMENDED
* Screwdriver
* Adjustable wrench
* PTFE tape
* Hexagon wrench
Your installation will require a pipe for the spout installation as well as other additional tools.
Installation Procedures
Step.1
Hot and cold pipes embedded in the wall.
�
COLD
Step.3
Prepare the body of the shower.
Step.5
Screw the faucet body on the in-wall tube,
Be sure to have a 0at gasket on the elbow.
rn
Step.2
Open the water,check the water 0ow is normal.
NOTICE:
Remove contaminants from the pipes before install the faucet,
To avoid affecting the water outlet.
Step.4
Step.6
u
Twining the PTFE tape on the G1/2 teeth of the
in-wall tube.
Check the installation is normal.