Plumbline Progetto C1500 Installation Instructions Manual Download Page 3

Clean with warm soapy water and a smooth 
cloth. Avoid abrasive sponges or detergents as 
these will damage the finish.

Cleaning

Remove the aerator with an aerator cartridge key.
Immerse for half a day in water-vinegar solution 
(80-20%).
Wash, then reassemble.

Aerator Maintenance

CLEANING & MAINTENANCE

Before you start, turn off the water supply to the 
mixer.
1. Remove the handle
2. Unscrew the dome (hand tightened)
3. Unscrew the locking nut
4. Remove the cartridge
Re-assemble in reverse order

 Max tightening torque on locking nut: 10-12 Nm

Cartridge Replacement

1

2

3

4

For full details about our warranty visit 

plumbline.co.nz/warranty-information

Warranty Information

Summary of Contents for Progetto C1500

Page 1: ...ALLATION INSTRUCTIONS COMO FLOOR MOUNT BATH FILLER HANDSHOWER C1500 T 04 568 9898 E sales plumbline co nz www plumbline co nz Distributed by IMPORTANT Please read these instructions prior to installat...

Page 2: ...mperature 45 65 C Angle valves and or filters are recommended to prevent impurities and debris entering the mixer Stop Taps Filters Always flush out the pipework before connecting any tapware Failure...

Page 3: ...0 Wash then reassemble Aerator Maintenance CLEANING MAINTENANCE Before you start turn off the water supply to the mixer 1 Remove the handle 2 Unscrew the dome hand tightened 3 Unscrew the locking nut...

Page 4: ...from the packaging and inspect for any transport damage No Name Qty 1 Mixer Body 1 2 Flange 1 3 Mounting Plate 1 4 Underfloor Mounting Box 1 5 Inlet Elbow 2 6 Handshower 1 7 Check Valve 1 8 Flow Regu...

Page 5: ...he mounting plate to the underside of the mixer body 2 Drill the holes for mounting the Underfloor Mounting Box The Underfloor Mounting Box must be recessed into the floor and levelled using the spiri...

Page 6: ...ace is finished up to the edge of the Underfloor Mounting Box 3 Wrap PTFE tape on the inlet elbows provided and screw them into the Underfloor Mounting Box Set the Underfloor Mounting Box into the rec...

Page 7: ...Align the copper pipes with the relevant hot cold connector holes on the Underfloor Mounting Box Fasten the fixing plate to the Underfloor Mounting Box 10 A check valve is pre installed in the handsh...

Page 8: ...V 16 11 2020 DIVERTER OPERATION Handshower On Handshower Off...

Reviews: