5
PREPARATION
ASSEMBLY INSTRUCTIONS
1
. Insert M8x35mm threaded end of the pegs
(DD) into the prethreaded holes by hand in the
fire bowl (C) until threads are tight.
Before beginning assembly of product, make sure all parts are present. Compare parts with package
contents list and hardware contents above. If any part is missing or damaged, do not attempt to
assemble the product. Contact customer service for replacement parts.
Estimated Assembly Time: 15 minutes
Tools Required for Assembly:
Phillips Screwdriver (Not Included) and Wrench (Included)
EE
Hardware Used
DD
M8x35mm
Threaded Peg
x 4
2
. Attach ash catcher (D) to fire bowl (C) by
inserting M5x8mm bolts (AA) from inside the
fire bowl and secure with M5 nuts (BB) from
underneath.
Secure with wrench (EE) and Phillips
Screwdriver.
EE
1
DD
C
2
AA
Hardware Used
AA
M5x8mm
x 3
BB
M5 Nut
x 3
EE
Wrench
C
D
BB