Playworld Systems XX0355 Cruise Line Installation Instructions Manual Download Page 14

Installation Instructions

Model XX0355

ECN2579

Page 14 of 16

Bill of Materials

XX0355 - CRUISE LINE

PART NO. 

DESCRIPTION 

QTY.

AAU0790         

BUMPER - CRUISE LINE                  

2  

AAU0791         

CASTING - 5.04" x 3.36" x 2.06" (RIGHT)         

2  

AAU0792           CASTING - 5.04" x 3.36" x 2.06" (LEFT)         

2  

AAU0816            CASTING - CRUISE LINE TROLLEY COVER           

4  

AFM6874             FAB METAL - 14.25" x 8.00" x .28"            

4  

AFR1474           CRUISE LINE FRAME                    

4  

AMC0660           GUIDE - 10.00" x 1.70" x .375" - UHMW          

4  

AMC0662            ROPE - CRUISE LINE                   

4  

APL2196             PLATE - 2.88" x 7.00" x .38"              

12 

ASY0330        

CRUISE LINE CABLE ASSEMBLY               

2  

ASY0357              ASSEMBLY - CRUISE LINE WHEEL              

2  

ATM0249        

SPACER - 1.00" O.D. x .375"                

4  

ATM0250             SPACER - .50" O.D. x 2.25"                

8  

BAD0085           THREAD LOCKING ADHESIVE                 

1  

BAE0015           SCREW - SELF THREADING #12-14 x 2.00"          

8  

BAE0158             WASHER - 1/4" SAE FLAT                 

16 

BAE0159            NUT - 1/4"-20 HEX LOCK w/o NYLON CAP           

8  

BAE0595            WASHER - 3/8" SAE FLAT                 

20 

BAE0600         

WASHER - 1" O.D. FLAT                   

24 

BAE0621            NUT - 3/8"-16 ZINC HEX w/LOCKING RING          

4  

BAE0632             NUT - 3/8"-16 x 1.25 BARREL w/PATCH           

8  

BAE0664     

BOLT - 3/8"-16 x 1" BUTTON HEAD - S.S.    

16

BAE0666   

BOLT - 3/8"-16 x 1-1/4" BUTTON HEAD - S.S.  

12 

BAE06682   

BOLT - 3/8"-16 x 3-1/4" BUTTON HEAD - S.S.  

4  

BAE0671     

BOLT - 3/8"-16 x 5" BUTTON HEAD - S.S.    

8  

BAE0690       

WASHER - .531" I.D. x 1.250" O.D. x .060" THICK       

4  

BAE0720           NUT - 1/2"-13 LOCK                    

2  

BAE0900           WRENCH - 5/32" SHORT HEX KEY              

1  

BAE0906              TOOL - 5/16 SHORT HEX KEY WRENCH            

1  

BAE0915         

BIT - 3/8 TAMPER RESISTANT               

1  

BAE0922           TOOL - TT 45 L WRENCH                  

1  

BAE9043              BOLT - 1/2"-13 x 3.25" HEX HEAD             

2  

BAE9044              BOLT - 1/4"-20 x 3.00" HEX HEAD             

8  

BPL0313            CAP - PM - ADVENTURE                  

4  

BPL3175             PLATFORM - CRUISE LINE                 

1

ALB0025 

LABEL - AGE APPROPRIATE SHEET 

1  

Para El Servicio De Cliente, Llamada

     800-233-8404 o                              

001-570-522-9800 

ESTADOS UNIDOS EXTERIORES

1000 Buffalo Road • Lewisburg, PA  17837  USA

playworld.com

Summary of Contents for XX0355 Cruise Line

Page 1: ...8 man hours Concrete Required 6 65 cubic yards 5 06 cubic meters Use Zone Refer to the information below User Group Age years ASTM CSA 5 12 EN 6 14 Assembly View Equipment Use Zone A ASTM 72 in 1830 m...

Page 2: ...Installation Instructions Model XX0355 ECN2579 Page 2 of 16 Top View Elevation Views 27 686 mm KEY Position Unit of Measurement Top Inches Bottom Millimeters...

Page 3: ...ons Model XX0355 ECN2579 Page 3 of 16 Footing Diagram 1 Top View Important Note Make sure the footings are laid out and spaced as shown in this Footing Diagram KEY Position Unit of Measurement Top Inc...

Page 4: ...Installation Instructions Model XX0355 ECN2579 Page 4 of 16 Footing Diagram 2 Side View and Top View KEY Position Unit of Measurement Top Inches Bottom Millimeters...

Page 5: ...in concrete Place post directly on packed stone or porous block The footings shown on Playworld Systems documentation are recommendations based on historical performance in average soil conditions Foo...

Page 6: ...t frames Support Frame AFR1474 4 Total 12 x 2 Self Threading Screw BAE0015 8 Total Post Cap BPL0313 4 Total Cruise Line Platform BPL3175 1 Total Cruise Line Bumper AAU0790 2 Total 3 8 Flat Washer BAE0...

Page 7: ...ball halves from one end of each rope and insert the rope through a platform casting Cruise Line Rope AMC0662 4 Total Right Casting AAU0791 2 Total Left Casting AAU0792 2 Total Place one frox ball hal...

Page 8: ...out Side with the riv nuts must be to the inside 2 25 Spacer ATM0250 8 Total Detail D 1 Attach the spacer plates to the trolley brackets Detail D 2 Attach the 2 25 spacers to the trolley brackets 3 8...

Page 9: ...9 Attach the pulley to the trolley bracket assembly Cable Assembly ASY0330 2 Total Trolley Bracket Assembly Pulley Assembly ASY0357 2 Total 375 Spacer ATM0249 4 Total 1 2 Flat Washer BAE0690 4 Total...

Page 10: ...ts Detail F 2 Seat the ropes in the first housing and attach the second housing to the trolley brackets Cable Guide AMC0660 4 Total Thin edge to the top Bend the cable guide to match the contour of th...

Page 11: ...Head Bolt BAE0671 8 Total Cable Assembly Note Use of a 7 ft or 8 ft step ladder will be needed to perform this step Important Note when attaching the cable assemblies to the support posts make sure th...

Page 12: ...355 ECN2579 Page 12 of 16 Detail H Step 13 Attach the platform to the ropes Cruise Line Platform 3 8 Flat Washer BAE0595 8 Total Contour of the casting must match the contour of the platform 3 8 x 1 1...

Page 13: ...nstallation attach the trolleys to the cable wire on the ground Step 9 Attach the pulley to the trolley bracket assembly See Detail E Place a cable into the open end of each bracket assembly and then...

Page 14: ...NUT 1 4 20 HEX LOCK w o NYLON CAP 8 BAE0595 WASHER 3 8 SAE FLAT 20 BAE0600 WASHER 1 O D FLAT 24 BAE0621 NUT 3 8 16 ZINC HEX w LOCKING RING 4 BAE0632 NUT 3 8 16 x 1 25 BARREL w PATCH 8 BAE0664 BOLT 3 8...

Page 15: ...cks or breakage If any damage is detected barricade the equipment to prevent use until repair is completed Contact your sales representative immediately for a replacement part Welds Inspect all welded...

Page 16: ...Sake Repairer Name Please Print __________________________________ Signature ________________________________________ Date ___ ___ ___ MAINTENANCE SCHEDULE Item in Question Description of Problem Corr...

Page 17: ...dependent upon the types of included play equipment Refer to the Use Zone diagram or master structure drawing Site layout is a critical part of the overall installation Footings must be measured and m...

Page 18: ...ehensive maintenance program must be developed for each playground and strictly followed All equipment must be inspected frequently for any potential hazards Special attention must to be given to movi...

Page 19: ...height dimensions Height measurements are taken from the top of the protective surfacing material Insure all fasteners are tightened according to tightening torque speci cations listed on your instal...

Reviews: