Installation Instructions
Model XX0355
ECN2579
Page 1 of 16
Installation Instructions
Playworld Systems
®
Model XX0355
Cruise Line
Installation Preparation
Recommended Crew: ........................... Four (4) adults
Installation Time: ................................... 18 man-hours
Concrete Required: ............................... 6.65 cubic yards (5,06 cubic meters)
Use Zone: .............................................. Refer to the information below
User Group Age (years): ....................... ASTM/CSA: 5-12, EN: 6-14
Assembly View
Equipment Use Zone
A - (ASTM) 72 in. (1830 mm)
(EN) 1500 mm
B - (CSA) 1800 mm
ICON KEY
Fully Tighten
Hardware
Add 1 Drop of
Thread Locking Adhesive
Do
Not
Fully Tighten
Hardware
Pour Concrete
Drill
Dig Footing Holes
Hammer
Critical Fall Height
A/B
A/B
A/B