Playworld Systems UN8727 Installation Instructions Manual Download Page 3

Installation Instructions

Models *UN8727 and UN8727S

PA1395, *ECN2643

Page 3 of 12

Elevation Views

UN8727S

Footing Diagram

KEY

Position

Unit of Measurement

Top #

Inches

Bottom # 

[Millimeters]

Top View

49" (1245 mm)
Footed as shown

>@

>

>@

>@

>@

>@

685)$&(/(9(/

 '(6,*1(' )25

127(6

Summary of Contents for UN8727

Page 1: ...ime In Ground 1 5 man hours Installation Time Surface Mount 1 man hour Concrete Required 0 12 cubic yard 0 09 cubic meters Use Zone See the master layout drawing User Group Age single cube ASTM CSA 2 12 EN 2 14 User Group Age multiple cubes ASTM CSA 5 12 EN 6 14 Assembly View representative model ICON KEY Fully Tighten Hardware Add 1 Drop of Thread Locking Adhesive Do Not Fully Tighten Hardware Po...

Page 2: ...structions Models UN8727 and UN8727S PA1395 ECN2643 Page 2 of 12 Top View Elevation Views UN8727 Footing Diagram 49 1245 mm Footed as shown KEY Position Unit of Measurement Top Inches Bottom Millimeters 0 1 0 1 685 9 ...

Page 3: ...uctions Models UN8727 and UN8727S PA1395 ECN2643 Page 3 of 12 Elevation Views UN8727S Footing Diagram KEY Position Unit of Measurement Top Inches Bottom Millimeters Top View 49 1245 mm Footed as shown 685 9 6 1 25 127 6 ...

Page 4: ...e step descriptions start on page 9 Detail A Step 4 Attach the top cube to the bottom cube Top Cube BPL3186 1 Total Bottom Cube BPL3187 1 Total 3 8 Flat Washer BAE0595 12 Total Plastic Washer half of a two piece assembly BPL0300 12 Total 3 8 x 2 3 4 Button Head Bolt BAE06677 6 Total 3 8 x 1 1 2 Button Head Bolt BAE06645 6 Total Note Large holes in the cubes are offset from each other ...

Page 5: ... to the bottom cube Anchor Post AFR1820 1 Total Logo Casting AAU0906 1 Total 3 8 x 3 Button Head Bolt BAE06681 3 Total 1 O D Flat Washer BAE0600 6 Total 3 8 Flat Washer BAE0595 3 Total Detail C Step 6 In Ground Model Attach the logo casting to the bottom cube 3 8 x 1 3 4 Button Head Bolt BAE0665 6 Total 3 8 Barrel Nut BAE0632 6 Total ...

Page 6: ...unt Model Attach the anchor frame to the bottom cube Anchor Frame AFR1874 1 Total 1 O D Flat Washer BAE0600 6 Total 3 8 x 1 3 4 Button Head Bolt BAE0665 6 Total 3 8 Barrel Nut BAE0632 6 Total Note For the surface mount model do not attach the logo casting until the component has been secured on its footing ...

Page 7: ... Total if not attaching to another cube Detail F Step 10 Fill in the unused holes inside and outside the ground level cube Align rivets as shown so they interlock Logo Casting AAU0906 1 Total 3 8 x 3 Button Head Bolt BAE06681 3 Total 3 8 Flat Washer BAE0595 3 Total Detail E Step 9 Surface Mount Model Attach the logo casting to the bottom cube ...

Page 8: ...stallation Instructions Models UN8727 and UN8727S PA1395 ECN2643 Page 8 of 12 Plastic Bolt Cap half of a two piece assembly BPL0300 12 Total Detail G Step 11 Insert the bolt caps into the plastice washers ...

Page 9: ...ame to the bottom cube See Detail D Position the top of the anchor frame against the bottom of the cube assembly and attach as shown Final Details Step 8 Finish assembling the structure Plumb and level the component Tighten all fasteners Fully tighten all fasteners according to tightening torque specifications Torque Specifications Bolts and nuts Snug tighten and then tighten an additional one half ...

Page 10: ...1 BPL3194 RIVET RATCHET 88 O D x 1 67 36 ALB0025 LABEL AGE APPROPRIATE SHEET 1 UN8727S GROUND LEVEL PLAYCUBE SURFACE MOUNT PART NO DESCRIPTION QTY AU0906 CASTING PLAYCUBES LOGO 1 AFR1874 FRAME 32 48 x 28 67 x 6 35 1 BAD0085 THREAD LOCKING ADHESIVE 1 BAE0595 WASHER 3 8 SAE FLAT 15 BAE0600 WASHER 1 O D FLAT 6 BAE0632 NUT 3 8 16 x 1 25 BARREL w PATCH 6 BAE0665 BOLT 3 8 16 x 1 75 BUTTON HEAD SS 6 BAE0...

Page 11: ... breakage If any damage is detected barricade the equipment to prevent use until repair is completed Contact your sales representative immediately for a replacement part Welds Inspect all welded joints If any broken welds are detected barricade equipment to prevent use until repair is completed Contact your sales representative immediately for a replacement part Equipment Maintenance Universal Mod...

Page 12: ... Safety s Sake Repairer Name Please Print __________________________________ Signature ________________________________________ Date ___ ___ ___ MAINTENANCE SCHEDULE Item in Question Description of Problem Corrective Action Date Inspector Name Please Print __________________________________ Signature _________________________________________ Date ___ ___ ___ Inspection Codes P Pass F Fail NA Not A...

Page 13: ...one of adjacent stationary play equipment if the adjacent designated play surfaces are no greater than 700 mm above the protective surfacing level They should be a minimum of 1800 mm apart EN compliance The overall use zone measurements for stationary play equipment are dependent upon the fall height of the equipment For a fall height exceeding 1500 mm a formula is applied to determine the use zon...

Page 14: ... post hole digger steel rake wheelbarrow garden hoe water hose tape measure level alignment tool 3 8 ratchet with 9 16 socket and 9 16 combination wrench Maintenance Inadequate maintenance of equipment has resulted in injuries on the playground Because the safety of playground equipment and its stability depends on good inspection and maintenance a comprehensive maintenance program must be develop...

Page 15: ...es 30 762 mm Varies 24 610 mm Component Footing Detail ASTM CSA Ground Level Concrete Protective Surfacing Level Factory Applied Protective Surfacing Level Sticker Component 2b Stone End Cap from Post Shipping Tube Drill holes in cap to allow for water drainage 400 mm 200 mm 610 mm 760 mm Footing Detail Component Post EN Ground Level Concrete Protective Surfacing Component 2b Stone Factory Applied...

Page 16: ...ent Footing Detail ASTM CSA Block Option Ground Level Concrete Protective Surfacing Level Factory Applied Protective Surfacing Level Sticker Component Block Porous Material 2 51 mm 18 457 mm Diameter Varies 42 1067 mm Varies 36 914 mm Ground Level Concrete Protective Surfacing Level Factory Applied Protective Surfacing Level Sticker Support Post Block Porous Material Support Post Footing Detail AS...

Page 17: ...level at the lowest grade Adjust other footings accordingly Support posts and all attaching decks and play components must be plumb and level Do not encase the bottom of the support post in concrete Place the post directly on packed stone or other porous material The footings shown on Playworld Systems documentation are recommendations based on historical performance in average soil conditions Foo...

Page 18: ...r the protective surfacing level at the lowest grade Adjust other footings accordingly Support posts and all attaching decks and play components must be plumb and level The footing size may vary due to local soil and weather conditions Base of footing must be below frost line Surface mount hardware is not supplied Customer is responsible for concrete base and providing surface mount hardware as sp...

Page 19: ... height dimensions Height measurements are taken from the top of the protective surfacing material Insure all fasteners are tightened according to tightening torque specifications listed on your installation instructions Insure all exposed pipe ends have properly installed end caps Insure that drive rivets are secure Clean dried concrete off of components and any other affected surface Touch up an...

Reviews: