Playworld Systems FUN-1780 Manual Download Page 9

Description

Concrete

(Yds3)

Total

Weight

(lbs)

Users

Design Number: FUN-1780A - Compliance and Technical Data

FUN-1780

Pre-

Consumer

Recycled Content

(lbs)

CO2e

Footprint

(kgs)

Install

Hours

Ref.

No.

Reference Document: ASTM F1487

Unit

ASTM

Status

Active

Play

Events

Post-

Part No.

Qty.

The lay-out for this custom playscape, design number FUN-1780A, has been configured to meet the requirements of the ASTM F1487 standard.  In 
addition, each of the above components listed as "Certified" have been tested and are IPEMA certified.  Components listed as "Not Applicable" do not fall 
within the scope of the ASTM F1487 standard and have not been tested.  IPEMA certification can be verified on the IPEMA website, www.ipema.org.  In the 
interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.

The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from 
harvesting raw materials to the time it leaves our shipping dock.  Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon 
producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every 
opportunity.  Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and 
sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas 
emissions in services and goods throughout their entire life cycle.

The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained 
surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as 
ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.

Installation times are based on one experienced installer.  A crew of three experienced individuals can perform the installation within the given time, each 
member working 1/3 of the given hours.  [Eg. Installation Time = 30 hours.  For a crew of three, each member will work 10 hours on the installation for a 
total of 30 hours on the project.]

A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing 
process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from 
captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.

A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from 
a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and 
sheet steel have been diverted from landfills.  Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.

** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.

ASTM F1487

2010 ADA Standards for Accessible Design

Installation Times

Carbon Footprint

Pre-Consumer Recycle Content

Post-Consumer Recycle Content

Wednesday, November 14, 2018

Page

of

2

2

Playworld.com

Summary of Contents for FUN-1780

Page 1: ...Equipment Manufacturer FUN 1780...

Page 2: ...Natural Marine Primary Equipment Manufacturer FUN 1780...

Page 3: ...le Elevated Activities Accessible Ground Level Activities Accessible Ground Level Play Types Required Provided ADA SCHEDULE 6 3 6 2 2 2 2 2 PLAYWORLD SYSTEMS INC 1000 Buffalo Road Lewisburg PA 17837 9...

Page 4: ...Level Play Types Required Provided ADA SCHEDULE 6 3 6 2 2 2 2 2 PLAYWORLD SYSTEMS INC 1000 Buffalo Road Lewisburg PA 17837 9795 USA B Paper Size DATE SCALE PROJECT NO PLAYGROUND SUPERVISION REQUIRED...

Page 5: ...OTING DETAIL1 SUPPORT POST FOOTING DETAIL 1 or 4 INDICATES POST LENGTH CANTILEVER T POST AND COMPONENT POST FOOTING DETAIL 2 ZZCH1850 INDICATES PART NUMBER GROUND ZERO POST FOOTING DETAIL 2 INDICATES...

Page 6: ...Lewisburg PA 17837 9795 USA B Paper Size DATE SCALE PROJECT NO PLAYGROUND SUPERVISION REQUIRED DRAWN BY FOOTING LEGEND 112 1850 ZZCH 144 GZ SPIRAL SLIDE CENTER POST FOOTING DETAIL1 SUPPORT POST FOOTIN...

Page 7: ...L ZZCH4318 1 7 FIND THE WAY HOME PANEL ZZCH4446 1 8 SLIDE N LEARN PANEL Crawl Tubes ZZCH4539 1 9 30in ROUND CRAWL TUBE Climbers ZZCH8289 1 10 RIBBON CLIMBER 36in DECK Audible Activities ZZCH4409 1 11...

Page 8: ...tified ZZCH4539 9 30in ROUND CRAWL TUBE 1 102 83 836 2 3 00 0 00 1 Certified ZZCH8289 10 RIBBON CLIMBER 36in DECK 1 35 02 101 2 1 50 0 06 1 Certified ZZCH4409 11 ACCESSIBLE BELL PANEL 1 22 16 211 1 0...

Page 9: ...d 15 Sep 2010 by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 Accessibility of Surface Systems Under and Around Playgrou...

Reviews: