1. Attach one 2" x 6" x 96"
beam cap to one 2" x 6" x 93"
beam at dimensions shown. Secure
with eight #8 x 2
¹|₂
" deck screws
equally spaced.
(Fig.1)
Note: The beam cap must overhang both
ends a minimum of 1
¹|₂
" and both sides
approximately 2".
(Fig.1)
2. Using a monkey ring hanger as a template, mark the beam
and drill two
¹|₈
" holes 1
¹|₂
" deep at each location.
(Fig.1)
Note: Dimensions are to CENTER of Ring Hanger.
3. Install six monkey ring hangers and six chains with two
¹|₄
" x 1
¹|₂
" lag screws each.
(Fig.1)
Note: DO NOT connect the yellow monkey rings until the playset has been properly installed
and is ready for use.
1
1
/
2
"
Fig. 1
Fig. 2
4. Lay two 4" x 4" x 96" posts 28
¹|₂
" apart and
attach four 2" x 4" x 28
¹|₂
" steps at dimensions
shown. Make sure the assembly remains square
while securing with #8 x 2
¹|₂
" deck screws
(Fig. 2)
Detail of Screw Placement
Predrill –
1
/
8
" Dia. for #8 x 2
1
/
2
" deck screws
2"
x
6"
x
93
"
2"
x
6"
x
96
"
6
1
/
2
"
16
"
16
"
16
"
16
"
16
"
6
1
/
2
"
93
"
2
"
• •
• •
• •
• •
• •
• •
• •
• •
• •
• •
• •
• •
• •
• •
• •
• •
4"
x
4"
x
96
"
4"
x
4"
x
96
"
2"
x 4
" x
28
1
/
2
"
2"
x 4
" x
28
1
/
2
"
2"
x 4
" x
28
1
/
2
"
2"
x 4
" x
28
1
/
2
"
A
A
A
A
A
A
A
A
48
"
28
1
/
2
"
18
1
/
2
"
33
1
/
4
"
Page 2
A
90
˚
BUILDING INSTRUCTIONS
Before starting to build your Play Action Set, make sure all
boards are cut and identified by size and name.