background image

For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)

Manufactured by Krauss Craft, Inc.
www.playcraftsystems.com

TERRACE CLIMBER

INSTALLATION INSTRUCTIONS

Rev E

9/25/2017

1240

Page 2 of 5

Step 1

 

Refer to Footing Layout and mark footing hole locations. 
Dig (3) Ø 12" footing holes. Refer to Footing Detail for 
depth and details.

IMPORTANT: For areas with soft soil conditions, larger 
footings may be required.  Additionally, half foot deck
heights will require 6" deeper footing holes.

* Footing depth must be adjusted to compensate for the 
depth/thickness requirements of selected safety 
surfacing. See Section 06.1 of the Installation Manual.

Footing Detail

Optional Filter Fabric over

Pea Gravel (for drainage)

Concrete Footing

Footing Anchor

Blocking, see

Installers Manual

2b Stone, Drain Rock

Undisturbed Soil

(Top of Soil)

(Finish Grade)

LOOSE FILL SURFACING MATERIAL SHOWN:

9" compressed or 12" uncompressed depth.

Compressed depth shown. (See Note D)

27"

*

686mm

18"

457mm

12"

305mm

Reviews: