16
STEP 4
1. Attach board(s) to Frame A as shown.
Note
the post & bracket orientation.
2” Lag Screw (x6)
TIP: Flex bracket(s) to make
installation of 2x4 easier
1-1/4” Lag Screw (x9)
Check to make sure
structure is square
(3) 1-1/4” Lag & (2) 2” Lag
per 2x4 Shelf Loc bracket
PF 4132
2’’x4’’x64-3/4’’
Frame A
(2) 2” Lag
(3)
1-1/4”
Lag
64-3/4”