©2021
Round
Rack
Setbacks
36"
30"
STREET
WALL
Page 1: ... 2021 Round Rack Setbacks 36 36 30 STREET WALL ...
Page 2: ... Tape Measure Marker or Pencil Masonry Drill Bit 3 8 Drill Hammer drill recommended Hammer Wrench 9 16 Level Drill 3 8 diameter holes 3 deep into surface Make sure the holes are at least 3 away from any cracks in the base material Thread nuts onto anchors leaving approximately 1 4 of the anchor protruding and tap into surface Tighten nuts down to secure rack Place the rack in the desired location ...
Page 3: ...here rack will be installed Make sure top of sleeve is at same level as desired finished concrete surface Fill sleeve with sand to keep it in place and prevent it from filling with concrete After appropriate cure time dig out sand from sleeves and insert racks making sure they are level and at the appropriate height Pour in Super Por Rok or epoxy grout and allow to set 1 3 2 Trowel Corrosion Resis...
Page 4: ...while the grout sets is to bolt two 1x4 boards together at one end and clamp them onto the legs of the rack like a clothes pin Core holes no less than 3 diameter 4 recommended and no less than 10 deep into sidewalk Place rack into holes making sure it is level until the grout has set 1 3 2 Trowel Hole coring machine with 4 bit Materials to build brace see Install Tip at bottom of page TIP Ø 3 min ...
Page 5: ... 2021 Installation Footing Diagrams Round Rack 12 36 10 18 24 IN GROUND MOUNT SURFACE MOUNT or standard 4 sidewalk slab ...