![Playcore DERO BIKER BAR Quick Start Manual Download Page 3](http://html.mh-extra.com/html/playcore/dero-biker-bar/dero-biker-bar_quick-start-manual_1566466003.webp)
1
3
4
2
TOOLS NEEDED
Tape Measure
Marker or Pencil
Masonry Drill Bit
Drill (Hammer drill recommended)
Hammer
Wrench 9/16”
Level
RECOMMENDED BASE MATERIAL
Solid concrete is the best base material for installation. To ensure
the proper anchors are shipped with your rack, ask your Dero Rack
representative which anchor is appropriate for your application.
Be sure nothing is underneath the base material that could be
damaged by drilling.
www.dero.com | 1-888-337-6729
© 2016 Dero
Place the stand in the desired location. Use a
marker or pencil to outline the holes of the flange
onto the base material.
Thread nuts onto anchors, leaving approximately
1/4” of the anchor protruding, and tap into
surface. Tighten nuts down to secure stand.
Place stand (and washers to level stand if
necessary) over holes.
Drill 3/8” diameter holes 3” deep into surface.
Make sure the holes are at least 3” away from
any cracks in the base material.
BIKER BAR™
Installation Instructions - Surface Mount