TECHNICAL SUPPORT: (909) 259-6001
BLSL840
11
Mounting Instructions
CONCRETE PAD
1. Follow the local building code to determine the requirement of the concrete pad.
2. We recommend the Pad measurements should be at least 28" long, 20" wide,
and 24
" deep to ensure the stable operation of the operator, and a minimum
of 4
" above level grade to avoid any flooding of the operator.
3. To support the weight of the gate, we recommend the path of the track should be
at least 10" wide and 6" deep.
Drill for a
1
/
2
" x 3
1
/
2
"
Red Head Anchor
(4) Places
20"
24"
10"
6
1
/
4
"
Track
2"
9
1
/
4
"
Minimum
4"
Minimum
28"
20
3
/
8
"
4"
Gate Operator Concrete Pad
Gate Operator Concrete Pad
Install a
Positive Stop
at Both Ends
of the Track
Operator Cover
Track Concrete Pad
Track Concrete Pad
Gate
Grade Level
See Note 2
Operator Chassis
12
7
/
8
"
Chain
6"
BLSL840 Manual_Layout 1 3/6/2014 5:01 PM Page 13
Summary of Contents for BLSL840
Page 1: ...BLSL840 BLSL840 Manual_Layout 1 3 6 2014 5 01 PM Page 1...
Page 2: ...BLSL840 Manual_Layout 1 3 6 2014 5 01 PM Page 2...
Page 33: ...BLSL840 Manual_Layout 1 3 6 2014 5 01 PM Page 33...
Page 34: ...BLSL840 Manual_Layout 1 3 6 2014 5 01 PM Page 34...
Page 35: ...BLSL840 Manual_Layout 1 3 6 2014 5 01 PM Page 35...