background image

FIGURE 2

A

IR

 F

LO

W

TUNGSTEN AUTOCLEANING NEEDLEPOINT EMITTERS

ELECTRICAL INSTALLATION INSTRUCTIONS

    WARNING: 

Do not connect to power before installation is complete. 

Always disconnect power to the unit before handling the ionizer. 

1.

 All field wiring to be in accordance with the National Electric Code 

Section 725 and authorities having jurisdiction.

2.

 

It is recommended that surge protection be installed with this ionizer at 
the equipment level, building level, or circuit breaker panel feeding the 
product.

3.

 If a step down transformer is used to feed the ionizer, the transformer 

must be grounded.

4.

 Do not install the ionizer on the same circuit as a UV Lamp or connect to 

the same transformer as a UV Lamp.

5.

 Connect power to ionizer using either 12V to 24V AC or DC. 

See Figure 3.

6.

 Connect power wires to power inlet fitting by pressing the orange tab 

firmly, inserting the appropriate wire, then releasing the orange tab. 
Repeat as necessary for the other wires. Strip wire insulation as necessary. 

7.

 For best results interlock ionizer power with fan control circuit.

8.

 Apply power to the unit. The LED indicator will be green when power is 

applied to the ionizer, but then turns orange when functioning properly.

CONNECT TO POWER

12-24V AC/DC

BLACK AC/DC

RED AC/DC

POWER INLET FITTING

(6 foot leads by Plasma Air)

FIGURE 3

Reviews: