background image

4

1. Introduction

This Operation Manual shall provide you with the essential instructions to ensure 

safe and reliable operation of your hoist and trolley. The instructions stipulated in 

the Operation Manual do not substitute accident prevention regulations issued by 

professional associations and various regulations valid in the relevant countries, which 

may vary. The instructions stipulated in this operation manual must be learned and 

followed! In the course of adjustment to the European market the regulations of many 

countries have been substituted with the International Regulations.

However, the point of all these regulations is the same: 

Accident prevention!

On Industrial Safety And Health and The Directive 2006/42/EC Of The European 

Parliament And Of The Council 2006/42/EG (EG Machinery Directive). Please look to 

your health and safety rules of  your country.

We would like our devices to be safe and reliable aids. Therefore, we have devised 

these operating instructions for you. Please make these instructions accessible to 

the service and maintenance personnel! If these instructions are disregarded they 

are worthless. If you need more copies of this Manual we will send them to you 

with pleasure. Furthermore, you must follow these operating instructions to save 

unnecessary expense; faulty maintenance work, faulty operation or accidents due to 

disregard of instructions shall revoke our warranty and liability. To ensure operational 

safety, the repairs or modifications must only be carried out by the appropriately trained 

professionals using original parts. Installation and fitting of parts made by companies 

other than PLANETA presents a safety risk and voids all our warranties.

Our representatives and service workshops are always at your disposal. Please refer to 

your specialised dealer from whom you have purchased your hoisting equipment. You 

will find their details on the machine sticker or in your invoice. In case it is not possible 

to read these details we will be happy to help you if you provide us with the serial no. of 

the machine. Our emergency number in Germany:

02325-9580-0

To order original parts, please refer to the spare parts list supplied with this manual. 

Please ensure that all functions and are tested following maintenance or repair works 

prior to start of operation.

If you observe these instructions you will always be satisfied with your device.

BetrSichV, The German Law For Equipment And Production (GPSG), The Ordinance 

In the Federal Republic of G

ermany there are following important: The 

DGU

V and 

Please mind these regulations and warnings strictly! 

Summary of Contents for GTM

Page 1: ...eration Maintenance Copying also in part is only allowed with the written permission of PLANETA Hebetechnik GmbH 01 05 01 0000 0315 00 BA EN PLA IMPORTANT READ BEFORE USE PLANETA Hebetechnik GmbH Resser Str 17 23 D 44653 Herne Tel 49 2325 9580 0 Fax 49 2325 77077 info planeta herne de www planeta hebetechnik de ...

Page 2: ......

Page 3: ...e 1 Introduction 4 2 Type plate 5 3 Safety instructions 6 4 Operation 8 5 Installation 9 6 Inspections repair and maintenance 10 7 Spare parts list 11 8 Annual UVV inspections 12 EC INSTALLATION DECLARATION Notes ...

Page 4: ...ith pleasure Furthermore you must follow these operating instructions to save unnecessary expense faulty maintenance work faulty operation or accidents due to disregard of instructions shall revoke our warranty and liability To ensure operational safety the repairs or modifications must only be carried out by the appropriately trained professionals using original parts Installation and fitting of ...

Page 5: ...ata can be found on the nameplate or your test certificate We reserve the right to make amendments without prior notification for the purpose of continuous quality improvement and compliance with new standards We would ask your indulgence if you find irrelevant paragraphs of this document deviating from the reality The next issue of this document will contain the updated information Provision of t...

Page 6: ...ts from current regulations standards and instructions Non compliance with the safety instructions stipulated in this Manual can cause serious injuries and fatalities In addition to the operating instructions observe the general statutory and other binding regulations on accident prevention and environmental protection These requirements may be relevant when e g handling dangerous substances or wh...

Page 7: ...he personnel to have their hair loose wear jewellery or loose clothing including rings There is a risk of injury through e g trapping or catching Warning and safety notes in the form of plates signs and stickers must not be removed and must be made in a professional manner All safety and warning notes on the chain hoist and travelling trolley must be readable IMPORTANT A hoist and trolley that hav...

Page 8: ...ur experts or have us find them Installation instructions Do not use the Trolley outdoors when it is not protected greased or leave it outside If it is still necessary to use the Trolley outdoors a roof or a sheet metal hood over the hoist to protect it from rain and other environmental influences is useful A new device is not subject to functional restrictions for outdoor operation or harmful env...

Page 9: ...unctions before leaving the factory if it is delivered in an assembled state The length of the hand chain is customised to the order The carrier flange width specified by you is considered as factory provided by us and the trolley is set accordingly If no flange width is specified then it is assumed that it should be used for different carriers within the scope of its adjustability and the trolley...

Page 10: ...er driven movement mechanisms or tow the trolleys using them Always keep a watch on the load if it is moved If multiple trolleys are required for carrying the load due to long or bulky load then every trolley should select the total carrying capacity of the added load This prevents damage in case the load hangs improperly on only one trolley 6 Inspection Repair and Maintenance If while dismantling...

Page 11: ... Handwheel shaft 11 Disc 5 Hand chain 12 Nut 6 Support bolts 13 Threaded bolts 7 Right side plate 14 Nut Example for item number Please always specify when ordering Type Manual trolley PTM Load bearing capacity 1 t Part Hanging plate Item no Z PTM 1T 08 Danger When mounting the untoleranced necessarily be considered G 0 5 t to 2 t SWL 2 mm 3 tons to 20 tons capacity 3 mm ...

Page 12: ...12 8 Annual UVV inspections Type of test Test date Name signature of the tester Findings ...

Page 13: ... to in Annex VII Part B of Directive 2006 42 EC were created We commit ourselves to the special documents to the above mentioned Products to submit a reasoned request to national bodies The transmission is electronic This statement applies only to the above mentioned Products Commissioning is prohibited until it has been determined that the above mentioned Products have been installed properly and...

Page 14: ...Notes ...

Page 15: ...Notes ...

Page 16: ...Ihr verantwortlicher Lieferant PLANETA Hebetechnik GmbH ...

Reviews: