![Planet XGS-5240-24X2QR Quick Installation Manual Download Page 3](http://html1.mh-extra.com/html/planet/xgs-5240-24x2qr/xgs-5240-24x2qr_quick-installation-manual_1563389003.webp)
3
1. Package Contents
Thank you for purchasing PLANET Layer 2+ 24-Port 10G SFP+ + 2-Port 40G
QSFP+ Managed Switch, XGS-5240-24X2QR.
Unless specified,
“Managed Switch”
mentioned in this Quick Installation Guide
refers to the XGS-5240-24X2QR.
Open the box of the
Managed Switch
and carefully unpack it. The box should
contain the following items:
z
The Managed Switch x 1
z
Quick Installation Guide x 1
z
RJ45-to-DB9 Console Cable x 1
z
Power Cord x 1
z
Rubber Feet x 4
z
Two Rack-mounting Brackets with Attachment Screws x 6
z
SFP+/QSFP+ Dust Cap x 26 (installed on the machine)
If any item is found missing or damaged, please contact your local reseller for
replacement.