background image

Industrial L2+ Multi-Port Full Gigabit

Managed Ethernet Switch

IGS-5225-4T2S/IGS-5225-4P2S

IGS-5225-4UP1T2S/IGS-5225-8P4S

IGS-5225-8P2T2S/IGS-5225-8P2T4S

Quick Installation Guide

Summary of Contents for IGS-5225-4P2S

Page 1: ...Industrial L2 Multi Port Full Gigabit Managed Ethernet Switch IGS 5225 4T2S IGS 5225 4P2S IGS 5225 4UP1T2S IGS 5225 8P4S IGS 5225 8P2T2S IGS 5225 8P2T4S Quick Installation Guide ...

Page 2: ... Grounding the Device 8 4 Terminal Setup 9 4 1 Logging on to the Console 10 4 2 Configuring IP address 11 5 Starting Web Management 13 5 1 Logging in to the Industrial Managed Switch 13 5 2 Saving Configuration via Web 16 6 Recovering Back to Default Configuration 17 7 Customer Support 20 ...

Page 3: ...dels is as follows GbE Copper Ports PoE Ports GbE SFP Ports IGS 5225 4T2S 4 2 IGS 5225 4P2S 4 at af 4 2 IGS 5225 4UP1T2S 5 bt 4 2 IGS 5225 8P4S 8 at af 8 1G 2 2 5G 2 IGS 5225 8P2T2S 10 at af 8 2 5G 2 IGS 5225 8P2T4S 10 at af 8 1G 2 2 5G 2 Industrial Managed Switch mentioned in this Quick Installation Guide refers to the above models ...

Page 4: ... 8P4S IGS 5225 8P2T2S IGS 5225 8P2T4S Quick Installation Guide DIN rail Kit Wall Mounting Kit DB9 to RJ45 RS232 Console Cable RJ45 Dust Cap 5 5 6 9 11 11 SFP Dust Cap 2 2 2 4 2 4 If any of these are missing or damaged please contact your dealer immediately If possible retain the carton including the original packing materials to enable you to repack the product in case there is a need to return it...

Page 5: ...onnection Terminal The above Workstations come with COM Port DB9 or USB to RS232 converter The above Workstations have been installed with terminal emulator such as Hyper Terminal included in Windows XP 2003 putty or tera term Serial cable one end is attached to the RS232 serial port while the other end to the console port of the Industrial Managed Switch z z Ethernet Port Connection Network cable...

Page 6: ...for Power 1 or Contacts 5 and 6 for Power 2 IGS 5225 8P4S IGS 5225 8P2T2S IGS 5225 8P2T4S DC 48 56V PWR1 PWR2 Alarm DI1 DO0 DO1 DI0 GND GND DC Input 48 56V 6A max Max Fault Alarm Loading 24V 1A 1 2 3 4 5 6 1 2 3 4 5 6 Figure 3 1 IGS 5225 8P4S IGS 5225 8P2T2S IGS 5225 8P2T4S Upper Panel IGS 5225 4UP1T2S DC 48 56V PWR1 PWR2 Fault DI1 DO0 DO1 DI0 GND GND DC Input 48 56V 6A max Max fault loading 24V 1...

Page 7: ...re 3 3 IGS 5225 4T2S Upper Panel IGS 5225 4P2S DC 48 56V Fault PWR1 V1 V2 PWR2 Max fault loading 24V 1A DC Input 48 56V 3 5A max 1 2 3 4 5 6 Figure 3 4 IGS 5225 4P2S Upper Panel 2 Tighten the wire clamp screws for preventing the wires from loos ening 1 2 3 4 5 6 V V V V Power 1 Power 2 Positive Pin Negative Pin IGS 5225 Series Pin 1 5 Pin 2 6 ...

Page 8: ...h Caution PWR1 and PWR2 must provide the same DC voltage for power load balance while operating with dual power input 3 1 Grounding the Device Users MUST complete grounding wired with the device otherwise a sudden lightning could cause fatal damage to the device PWR1 PWR2 Fault DI1 DO0 DO1 DI0 GND GND DC Input 48 56V 6A max Max fault loading 24V 1A 1 2 3 4 5 6 1 2 3 4 5 6 Earth Ground ...

Page 9: ...station with Terminal Emulation Software RJ45 to DB9 RS232 Cable Serial Port Console Port 115200 N 8 1 IGS Industrial Managed Switch 11 Console 115200 N 8 1 P1 P2 Fault DIDO Ring 11 R O 12 12 PoE Usage ACT 1000 LNK ACT 100 LNK A terminal program is required to make the software connected to the IGS 5225 series Industrial Managed Switch 1 Run terminal program on the OS 2 When the following screen a...

Page 10: ... log in user name and password The default user name and password are shown as follows and the login screen in Figure 4 1 appears User name admin Password admin Figure 4 1 Console Login Screen The user can now enter commands to manage the Industrial Managed Switch For a detailed description of the commands please refer to the following chapters Note 1 For security reason please change and memorize...

Page 11: ...show ip interface brief 2 The screen displays the current IP address shown in Figure 4 2 Figure 4 2 IP Information Screen Configuration of the IP Address 3 At the prompt enter the following command and press Enter as shown in Figure 4 3 IGS 5225 4UP1T2S configure terminal IGS 5225 4UP1T2S config interface vlan 1 IGS 5225 4UP1T2S config if vlan ip address 192 168 1 100 255 255 255 0 The previous co...

Page 12: ...g startup config Figure 4 4 Saving Current Configuration Command Screen If the IP is successfully configured the Industrial Managed Switch will apply the new IP address setting immediately You can access the Web interface of the Industrial Managed Switch through the new IP address Note If you are not familiar with the console command or the related parameter enter help anytime in console to get th...

Page 13: ... to 192 168 0 x where x is a number between 1 and 254 except 100 and the default subnet mask is 255 255 255 0 IP Address 192 168 0 x IP Address 192 168 0 100 IGS Industrial Switch RJ45 UTP Cable Figure 5 1 IP Management Diagram 5 1 Logging in to the Industrial Managed Switch 1 Use Internet Explorer 8 0 or above for Web browser and enter IP address https 192 168 0 100 the factory default IP address...

Page 14: ...ss 192 168 0 100 Default User Name admin Default Password admin Figure 5 2 Login Screen 3 After entering the password the main screen appears as shown in Figure 5 3 Figure 5 3 Web Main Screen of Industrial Managed Switch ...

Page 15: ...ne or more buttons such as System Switching QoS Security PoE Ring ONVIF and Maintenance Figure 5 4 Switch Menu Now you can use the Web management interface to continue the Switch management Please refer to the user manual for more Note If you are not familiar with Switch functions or the related parameter press Help icon like the following anytime on the Web page to get the help description ...

Page 16: ...ion the startup configuration file will be loaded automatically across a system reboot 1 Click the Save icon on the top Switch Menu bar Figure 5 5 Save Config Hot Key 2 Press the Save Configuration button 3 Or the other way to save the setting is to Click Maintenance Save Startup Config Figure 5 6 Save Config Maintenance ...

Page 17: ...re reset button on the front panel for about 10 seconds After the device is rebooted you can log in the management Web interface within the same subnet of 192 168 0 xx and default password Be noted that all the previous setups will be disappeared after the factory default reset is made P1 P2 Fault Ring Reset 115200 N 8 1 1000 LNK ACT 100 LNK ACT R O 6 5 Reset Figure 6 1 IGS 5225 4T2S Reset Button ...

Page 18: ...00 ACT LNK 4 3 2 1 2 1 bt af at Reset Figure 6 2 IGS 5225 4UP1T2S Reset Button 9 10 11 10 100 1G LNK ACT LNK ACT 100 1G 2 5G LNK ACT LNK ACT 11 12 13 13 14 Reset IGS 5225 8P2T4S 12 14 Reset Figure 6 3 IGS 5225 8P4S IGS 5225 8P2T2S IGS 5225 8P2T4S Reset Button ...

Page 19: ...19 Reset P1 P2 Fault Ring R O Console 115200 N 8 1 ACT 1000 LNK ACT 100 LNK 5 6 120W PoE Usage 90W 60W 30W Reset Figure 6 4 IGS 5225 4P2S Reset Button ...

Page 20: ...am mail address support planet com tw IGS 5225 4T2S IGS 5225 4P2S IGS 5225 8P2T4S IGS 5225 8P4S IGS 5225 8P2T2S IGS 5225 4UP1T2S User s Manual https www planet com tw en support downloads met hod keyword keyword IGS 5225 view 3 list Please select your switch model name from the Product Model drop down menu Copyright PLANET Technology Corp 2021 Contents are subject to revision without prior notice ...

Reviews: