
14
3. Installation
This section describes the functionalities of the Industrial PoE+ Switch’s
components and guides how to install it on the DIN-rail and wall. Basic knowledge
of networking is assumed. Please read this chapter completely before continuing.
Note
This following picture is telling the user how to install the device,
and the device is not IFGS-1022HPT.
3.1 DIN-rail Mounting Installation
The DIN-rail is screwed on the Industrial PoE+ Switch when out of factory. When
replacing the wall-mount application with DIN-rail application, Industrial PoE+
Switch is needed. Please refer to the following figures to screw the DIN-rail on the
Industrial PoE+ Switch. To hang the Industrial PoE+ Switch, follow the following
steps:
Step 1:
Screw the DIN-rail on the Industrial PoE+ Switch.