![Pkm PKM 6091H Instruction Manual Download Page 23](http://html1.mh-extra.com/html/pkm/pkm-6091h/pkm-6091h_instruction-manual_1561255023.webp)
23
4.
Drill the holes and fix the
suspension device with the screws
and dowels.
5.
Hang the hood on the fixed
suspension device.
6.
Install the flat bar on the bottom chimney first, then on the wall. You can carry
out this step provisionally to mark the drillings of the wall mounting and drill
the relevant holes.
Wall
Chimney
Chimney
7.
Place the top and bottom chimney on the hood and fix the bottom one on it
(look at the drawing connect chimney to hood).
8.
Fix the chimney-installation bracket below the ceiling on the wall using the
screws and dowels.
Screw chimney ↔
bracket
Screw
chimney
↔
bracket
9.
Lay the exhaust hose to the wall
outlet. Fix the exhaust hose with the
cable tie (1) on the wall-outlet.
10.
Fix the top chimney on the installation bracket (look also on step 8).
11.
Insert the grease filters and connect the appliance to the mains
4
.
Check the correct position of the hood from front and side perspective.
Otherwise the appliance will not work properly.
Carbon filter
4
If the socket is covered by the chimney, you must plug in the appliance at an
earlier point in
time.