Step 2.1
Assemble six like this for the top rails.
Step 2
Parts Needed
6x
L-Bracket for Top Rails
46104
6x
Slotted L-Bracket for Bottom Rails
46104
Note: Loosely tighten the Square Nuts (46102) onto the Bolt
(1/4"-20 x 1/2") 46101 through the L-Brackets (46104).
12x
Bolt (1/4"-20 x 1/2")
46101
12x
Square Nut (1/4"-20)
46102
Step 2.0
Assemble six like this for the bottom rails.
Innovation Workstation Assembly Instructions
6
Summary of Contents for INNOVATION WORKSTATION
Page 1: ...46548 INNOVATIONWORKSTATION Assembly Instructions...
Page 3: ...46548 Innovation Workstation Assembly Guide Innovation Workstation Assembly Instructions 1...
Page 7: ...Detail Innovation Workstation Assembly Instructions 5...
Page 15: ...Detail 1 Detail 2 Innovation Workstation Assembly Instructions 13...
Page 17: ...Detail 1 Detail 2 Innovation Workstation Assembly Instructions 15...
Page 19: ...Detail 1 Detail 2 Innovation Workstation Assembly Instructions 17...
Page 22: ...Step 9 1 Detail 1 Detail 2 Innovation Workstation Assembly Instructions 20...
Page 24: ...Step 10 1 Innovation Workstation Assembly Instructions 22...
Page 25: ...Step 10 2 Innovation Workstation Assembly Instructions 23...
Page 26: ...Step 10 3 Innovation Workstation Assembly Instructions 24...
Page 27: ...Detail 1 Detail 2 Innovation Workstation Assembly Instructions 25...
Page 30: ...Detail Step 11 1 Innovation Workstation Assembly Instructions 28...
Page 32: ...Detail 1 Detail 2 Innovation Workstation Assembly Instructions 30...
Page 33: ...Finished assembly should look like this Innovation Workstation Assembly Instructions 31...