PROPELLER DEICING SYTEM (Cont.)
H. DEICER BLADES (Cont.)
(8) PREPARATION AND APPLICATION OF SEALER (Cont.)
(f) Insure that a fillet of filler completely covers area between deicer strap and blade (See figure
17.) Immediately remove masking tape and allow filler to dry for six hours.
(g) Apply new masking tape approximately .125 of an inch beyond filler to allow application of
sealer directly to metal. Apply one even brush coat of 82-076-1/2 sealer (or C19861/C-16176
paint) over .125 of an inch of bare metal, filled area and .250 of an inch of deicer. (See
(h) Insure that sealer completely covers area between deicer strap and blade. (See Figure 17.)
Immediately remove masking tape and allow sealer to dry for 24 hours before starting
engine.
Sealer Application (Boot)
Sealer Application (Lead Strap)
Figure 16
Figure 17
(9) WRINKLED DEICERS (Refer to Figure 15.)
If edge of deicer is found wrinkled or loose, try recementing. Use MEK or Toluol to loosen the
bond for an additional 1/4 inch beyond the loose or wrinkled area. Apply one coat of 1300L
cement to the deicer and propeller bonding surfaces and allow to air dry for one hour. Then apply
a second coat of 1300L cement to both the deicer and bonding surface. Allow to dry. Retackify
with MEK or acetone and press with fingers to work out wrinkles or to secure loose edges. If
material has stretched and will not cement flat, replace the deicer.
(10) ELECTRICAL CHECK
(a) Check electrical resistance of each of two elements within deicer. Refer to Schematic, in
Chapter 91 and Resistance Check of Deicer Blade. Refer to Step 3 below.
(b) Check for intermittent open circuits by tensioning deicer strap slightly while measuring
resistance. Also, press lightly on deicer surface in area adjacent to strap retainer. Resistance
must not vary.
PIPER AIRCRAFT
PA-32R-301/301T
MAINTENANCE MANUAL
30-60-00
Page 30-46
Reissued: July 1, 1993
2I16
Summary of Contents for PA-32R-301T SARATOGA S
Page 26: ...CHAPTER 4 AIRWORTHINESS LIMITATIONS 1C1 ...
Page 29: ...CHAPTER 5 TIME LIMITS MAINTENANCE CHECKS 1C4 ...
Page 53: ...CHAPTER 6 DIMENSIONS AND AREAS 1D6 ...
Page 64: ...CHAPTER 7 LIFTING AND SHORING 1D21 ...
Page 68: ...CHAPTER 8 LEVELING AND WEIGHING 1E1 ...
Page 72: ...CHAPTER 9 TOWING AND TAXIING 1E5 ...
Page 76: ...CHAPTER 10 PARKING AND MOORING 1E9 ...
Page 80: ...CHAPTER 11 REQUIRED PLACARDS 1E13 ...
Page 92: ...CHAPTER 12 SERVICING 1F1 ...
Page 126: ...CHAPTER 20 STANDARD PRACTICES AIRFRAME 1G17 ...
Page 127: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 139: ...CHAPTER 21 ENVIRONMENTAL SYSTEMS 1H5 ...
Page 188: ...CHAPTER 22 AUTOFLIGHT 1J7 ...
Page 193: ...CHAPTER 23 COMMUNICATIONS 1J12 ...
Page 203: ...CHAPTER 24 ELECTRICAL POWER 1J22 ...
Page 263: ...CHAPTER 25 EQUIPMENT FURNISHINGS 2A13 ...
Page 269: ...CHAPTER 27 FLIGHT CONTROLS 2A20 ...
Page 332: ...CHAPTER 28 FUEL 2D11 ...
Page 363: ...CHAPTER 29 HYDRAULIC POWER 2E18 ...
Page 404: ...CHAPTER 30 ICE AND RAIN PROTECTION 2G16 ...
Page 470: ...CHAPTER 32 LANDING GEAR 3A13 ...
Page 550: ...CHAPTER 33 LIGHTS 3D24 ...
Page 562: ...CHAPTER 34 NAVIGATION AND PITOT STATIC 3E12 ...
Page 582: ...CHAPTER 35 OXYGEN 3F8 ...
Page 604: ...CHAPTER 37 VACUUM 3G6 ...
Page 616: ...CHAPTER 39 3G18 ELECTRIC ELECTRONIC PANELS MULTIPURPOSE PARTS ...
Page 620: ...CHAPTER 51 STRUCTURES 3G22 ...
Page 636: ...CHAPTER 52 DOORS 3H14 ...
Page 650: ...CHAPTER 55 STABILIZERS 3I4 ...
Page 662: ...CHAPTER 56 WINDOWS 3I16 ...
Page 670: ...CHAPTER 57 WINGS 3I24 ...
Page 688: ...CHAPTER 61 PROPELLER 3J18 ...
Page 704: ...CHAPTER 70 STANDARD PRACTICES ENGINES 3K10 ...
Page 708: ...CHAPTER 71 POWER PLANT 3K14 ...
Page 737: ...CHAPTER 73 ENGINE FUEL SYSTEM 4A13 ...
Page 749: ...CHAPTER 74 IGNITION 4B1 ...
Page 783: ...CHAPTER 77 ENGINE INDICATING 4C11 ...
Page 793: ...CHAPTER 78 EXHAUST 4C21 ...
Page 801: ...CHAPTER 79 OIL 4D5 ...
Page 805: ...CHAPTER 80 STARTING 4D9 ...
Page 819: ...CHAPTER 81 TURBINES 4D23 ...
Page 833: ...CHAPTER 91 CHARTS WIRING DIAGRAMS 4E13 ...