background image

ELECTRICAL RATING

PROOFER OPERATING INSTRUCTIONS

1.  Turn power switch 

ON

.

2.  Fill water pan with hot water.
3.  Set thermostat at 100 degrees. Allow approximately 15 minutes to reach temperature.
4.  Set the humidity control at #2 or #3 setting. At the proper setting your proofer door 

will have a light haze on it. If water beads up and runs down the door, the setting is 
too high. You may need to adjust according to atmospheric conditions.

Ideal proofing conditions consist of a temperature of 100 degrees and 60%-80% humidity. 
Proofing times will vary depending on the handling and the type of dough products. 
Sugar and yeast must be able to react properly which takes a certain amount of time. 
This 

cannot

 be altered by adjusting the settings. Correct proofing is very important for a 

successful bake.

Make sure your dough is completely thawed and at room temperature (if using frozen 
dough products) before placing the products in the proofer! If not, it can take two to three 
times longer to proof.

HINT: 

You may want to place the dough (from the retarder) on a room temperature pan 

NOT

 the cold pan it was just sitting on. This helps shorten the proofing time. When 

putting cold pans in the proofer, you bring the temperature down, taking longer for it to 
get back to the desired 100 degree temperature.

WARNING

Low water level or scale build-up in the water pan will cause premature failure of 
the humidity system and will void the warranty.

5

VOLTS

PHASE

WIRE*

AMPS

WATTS

HERTZ

120

1

2

13

1550

60

Installation should be made by a licensed electrician. Check local codes 
for vent hood requirments.
* Number of wires does not include ground.

Summary of Contents for AP PROOFER

Page 1: ...mber Date of Purchase Part Description and number as shown in parts list IMPORTANT INFORMATION READ BEFORE USE Piper Products Inc 300 South 84th Avenue Wausau WI 54401 Phone 715 842 2724 FAX 715 842 3...

Page 2: ......

Page 3: ...IGHT DAMAGE CLAIMS SAFETY PRECAUTIONS UNPACKING YOUR EQUIPMENT INSTALLATION ELECTRICAL RATINGS PROOFER OPERATING INSTRUCTIONS GENERAL CLEANING TROUBLESHOOTING GUIDE REPLACEMENT PARTS WIRING DIAGRAM WA...

Page 4: ...until equipment is unpacked notify the transportation company immediately and tell them you want to file a concealed damage claim This must be done within five 5 days after delivery was made Be sure t...

Page 5: ...specified by the manufacturer or have the same characteristics as the original part Unauthorized substitutions may result in fire electrical shock or other hazards 10 This Operators Manual should be...

Page 6: ...made by a licensed electrician Check unit nameplate for electrical requirements Make sure that the thermostats are all set to the OFF position Connect the electrical power cord and plug to a properly...

Page 7: ...adjusting the settings Correct proofing is very important for a successful bake Make sure your dough is completely thawed and at room temperature if using frozen dough products before placing the prod...

Page 8: ...cing CAUTION Prior to cleaning or maintenance turn all switches OFF and disconnect the power Unit should be cleaned daily Stainless Steel and Aluminum Piper only approves soap and water for cleaning s...

Page 9: ...l setting is adjusted higher Insufficient humidity in the proof box Check water level in water pan If dry check for leak or small hairline crack Check humidity burner under water pan Check to see if h...

Page 10: ...8 REPLACEMENT PARTS...

Page 11: ...WIRING DIAGRAM 9 1045 WATTS 500 WATTS P P blower motor NEMA 5 15 H1 L1 HC L2 P...

Page 12: ...r to repair or replace a defective part is the exclusive remedy for breach of this warranty and we will not be liable for any other damages or claims including consequential damages If upon inspection...

Page 13: ...Piper Products Inc 300 South 84th Avenue Wausau WI 54401 Phone 715 842 2724 FAX 715 842 3125...

Reviews: