XV-HTD7
128
1
2
3
4
1
2
3
4
C
D
F
A
B
E
14
14
15
Remove the three flexible cables.
Set the arranged flexible cables out of the way.
16
Remove the five screws.
17
Remove the Traverse Mecha. Assy-S.
14
15
15
14
24P Flexible cable
24P Flexible cable
To
Pickup connector
78 mm
SSIB Assy
17P Flexible cable
×
2
×
4
16
×
2
16
17
16
Traverse Mecha. Assy-S
Float Rubber
Note on the Float Rubber Installation
Styling the Pickup flexible cable
Hook
×
2
Float Rubber
Pole of the Float Base
NG
OK
17P Flexible cable
24P Flexible cable
Styling the flexible cable installation
Summary of Contents for XV-HTD7
Page 28: ...XV HTD7 28 1 2 3 4 1 2 3 4 C D F A B E 3 7 DVDM ASSY 3 3 E 3 3 3V REG E 2 3 AD AD AD ...
Page 51: ...XV HTD7 51 5 6 7 8 5 6 7 8 C D F A B E ...
Page 77: ......
Page 78: ......
Page 130: ......