3.2 Installation space and clearance
3.3 Installing the outdoor unit
Outdoor Unit Installation
Unit can be installed based on following :
Orientation 1 : 2 X KODH75 to 150
Orientaition 2: 4 X KODH75 to 150.
Front
Front
3.3.1 Unit lifting
• Holes at the unit base are for the lifting purpose.
Belt shall be used for the lifting. Make sure the belt
is able to withstand weight.
• The length of the belt shall be adjust properly, in
order to prevent the imbalance of the unit when
lifting.
3.3.2 Unit Support
• Unit shall be placed on a secured base, on
slab, curb or steel frame.
• Absorber should be installed to absorb the
unit vibration during operation
slab/ curb
absorber