
Condensing unit Installation
Condensing unit Installation
•
In order to optimize capacity, unit shall be installed as recommended requirements :-
a) Allow sufficient space around the unit, to avoid the recirculation of the hot discharge air.
b) Ensure no obstruction air flow into or out of the unit.
c) The location which is well ventilated
d) A place which protected from direct sunlighght, use an awning for protection , if necessary.
e) A place where the hot air discharge and operating sound level will not annoy the neighbours.
f) A place must not be susceptible to dust or oil mist, or other corrosive chemicals
Caution: If the condensing unit is operated in an atmosphere containing oils (including
machine oils), salt (coastal area), sulphide gas (near hot spring, oil refinery plant), corrosive
chemicals etc may lead to failure of the unit.
Installation Space and Clearance
Orientation 1 2 X KODH075 to 150
Orientation 2 2 X KODH075 to 150, 1 X KODH 200
Orientation 3 4X KODH075 to 150, 2 X KODH 200
5NITINMM