![Pioneer DV-300-K Service Manual Download Page 25](http://html.mh-extra.com/html/pioneer/dv-300-k/dv-300-k_service-manual_328843025.webp)
DV-300-S
25
5
6
7
8
5
6
7
8
C
D
F
A
B
E
[ 24 pin FFC ]
shown from Fig. 2-8.
2-8: FFC WIRE HANDLING
1. When installing the FFC, fold it correctly and install it as
positions for the FFC.
1. Do not make the folding lines except the specified
NOTE
Fig. 2-8
Traverse Ass'y
• Loosen the wire in the direcion of the arrow.
Check Hook
Fig. 2-7-E
~ FEED MOTOR ~
WHITE (4)
BROWN (3)
~ SPINDLE MOTOR ~
YELLOW (2)
GREEN (1)
Fig. 2-7-D
Switch PCB Ass'y
Printing Surface
Fold
79
±
1 mm
Reinforcement Plate
To Pick Up PCB
Summary of Contents for DV-300-K
Page 74: ...DV 300 S 74 1 2 3 4 1 2 3 4 C D F A B E Pin Function ...
Page 75: ...DV 300 S 75 5 6 7 8 5 6 7 8 C D F A B E ...
Page 76: ...DV 300 S 76 1 2 3 4 1 2 3 4 C D F A B E ...
Page 77: ...DV 300 S 77 5 6 7 8 5 6 7 8 C D F A B E ...
Page 78: ...DV 300 S 78 1 2 3 4 1 2 3 4 C D F A B E ...
Page 79: ...DV 300 S 79 5 6 7 8 5 6 7 8 C D F A B E ...
Page 80: ...DV 300 S 80 1 2 3 4 1 2 3 4 C D F A B E ...
Page 81: ...DV 300 S 81 5 6 7 8 5 6 7 8 C D F A B E ...