
Wiring
Operating Manual PSSu E F 2DI 60-R
1002506-EN-04
21
}
Use copper wiring.
6.2
Terminal configuration
Base module
Terminal configuration
Screw terminals:
PSSu BP 1/8 S-T
Cage clamp terminals:
PSSu BP 1/8 C-T
Without C-rail:
11: Input I0+
21: Input I0-
14: Input I1+
24: Input I1-
21
11
22
12
23
13
24
14
With C-rail:
11: Input I0+
21: Input I0-
12-22: n.c.
13-23: C-rail supply
(13-23-16-26 linked within
the base module)
14: Input I1+
24: Input I1-
15-25: n.c
16-26: C-rail supply
(13-23-16-26 linked within
the base module)
21
11
22
12
23
13
24
14
26
16
25
15
}
n.c. = not connected