FUSELAGE CARRY THROUGH FRAMES
GEOMETRY INSPECTION
Table of Contents
Page
FUSELAGE CARRY THROUGH FRAMES - GEOMETRY INSPECTION.................................
Index of Tables
Page
1
2
3
4
5
6
7
Index of Figures
Page
1
Jig Assembly LH & RH Lug Bush Fitment..............................................................
2
3
Lug Gap Identification and Measurements.............................................................
4
Wing Alignment and Longitudinal/Roll Checks.......................................................
References
Table 1 References
Data module/Technical publication
Title
ALIGNMENT AND SYMMETRY - UNSCHEDULED INSPEC-
TIONS
WING AND FUSELAGE FITTINGS - INSPECTION/CHECK
LEFT WING – HYDRAULIC LANDING GEAR - REMOVAL
LEFT WING – ELECTRO MECHANICAL LANDING GEAR -
REMOVAL
LEFT WING - HYDRAULIC LANDING GEAR - INSTALLATION
LEFT WING – ELECTRO MECHANICAL LANDING GEAR -
INSTALLATION
RIGHT WING – HYDRAULIC LANDING GEAR - REMOVAL
RIGHT WING – ELECTRO MECHANICAL LANDING GEAR -
REMOVAL
PC-12/47E AMM Doc No 02300, ISSUE 01 REVISION 27 MSN 545, 1001-1719, 1721-1942
12-B-AM-00-00-00-I
UNCLASSIFIED
Effectivity: All
12-B-05-50-07-00A-282A-A
UNCLASSIFIED
19.11.2019 Page 1