PIETRO FIORENTINI VS/AM 58 Technical Manual Download Page 6

Technical Manual 

MT 302-I

 

 

 

 

2.0 

INSTALLATION 

 

2.1 

GENERAL WARNINGS 

 
Before installation, commissioning or maintenance, operators must: 

-

 

Take  note  of  the  safety  regulations  applicable  to  the 
installation in which they must work; 

-

 

Obtain the necessary permits to operate when required; 

-

 

Acquire  the  necessary  personal  protective  equipment 
(helmet, goggles, etc.); 

-

 

Ensure that the area in which they operate is equipped with 
the required collective protection and the necessary safety 
information. 

The  equipment  and  its  components  must  be  handled  after  ensuring 
that  the  lifting  means  are  adequate  for  the  loads  to  be  lifted  (lifting 
capacity and functionality). The equipment must be handled using the 
lifting points provided on the equipment itself. 
The use of motorized means is reserved for the persons in charge.  
 
If  the  installation  of  the  equipment  or  its  accessories  requires  the 
application  of  compression  fittings,  these  must  be  installed  following 
the  instructions  of  the  manufacturer  of  the  fittings  themselves.  The 
choice  of  fittings  must  be  compatible  with  the  use  specified  for  the 
equipment and with the specifications of the system when provided for. 
 
Commissioning  must  be  carried  out  by  properly  trained  personnel: 
during  commissioning  activities,  personnel  who  are  not  strictly 
necessary must be kept at a distance and the forbidden area must be 
suitably marked (signs, barriers, etc.). 
 

2.2 

GENERAL REQUIREMENTS 

 
The valve must be installed in compliance with the regulations (laws or 
standards) in force in the place of installation. 
In  particular,  systems  for  natural  gas  must  possess  features  in 
accordance  with  the  legal  requirements  or  regulations  in  force  at  the 
installation site or at least in accordance with EN 12186 or EN 12279 
(please  note  that  installation  in  compliance  with  these  regulations 
minimizes the risk of fire hazard). 
The valve must be installed making sure that the operating pressure of 
the  unit  on  which  it  is  installed  never  exceeds  the  maximum 
permissible pressure value (PS).  
The  user  must  also  set  up  the  system  with  appropriate  venting  or 
drainage  systems  in  order  to  discharge  the  pressure  and  the  fluid 
contained  in  the  system  before  carrying  out  any  inspection  and 
maintenance activities. 
The pilot of the valve is sealed after being tested  and  calibrated; the 
sealing is done in three points: 

 

On the adjustment plug 

 

2.3 

SPECIAL REQUIREMENTS 

 

Before installing the valve, you must ensure that: 

-

 

The  valve  can  be  inserted  in  the  space  provided  and  is 
sufficiently  accessible  for  subsequent  maintenance 
operations Table 2 shows the dimensions and weights; 

-

 

In the case of installation with horizontal flow direction, the 
upstream and downstream piping is at the same level as the 
input and output connections; 

-

 

The upstream piping (and downstream only if installed with 
horizontal flow direction) can bear the weight of the valve; 

-

 

The  inlet  /  outlet  flanges  of  the  piping  are  parallel  to  the 
valve sealing surfaces; 

-

 

The inside of the valve is clean and the valve itself has not 
been damaged during transport; 

-

 

The  upstream  piping  has  been  cleaned  in  order  to  expel 
residual  impurities  such  as  welding  slag,  sand,  paint 
residues, water, etc ..; 

 
Install  the  valve  taking  into  consideration  that  the  direction  of  flow  is 
required and is indicated with an arrow on the body of the valve itself. 
The connections to the input and output pipes are done using standard 
flanges whose sizes and types are indicated on the rating plate (see 
section  2.4);  the  choices  of  connecting  screws  and  seals  must  be 
made by the installer considering this information and the conditions of 
use at the installation site. 
 
N.B  The  valve  is  designed  to  operate  at  atmospheric 
backpressure (=0).
 Please pay attention in ensuring compliance with 
the valve design conditions during the sizing of the line downstream of 
the valve itself. 
NOTE: the correct sizing of the discharge line downstream of the valve 
is the responsibility of the system designer. 
 

2.3 

REACTION FORCES DUE TO 
DISCHARGE 

 
After  opening  of  the  valve  due  to  overpressure  of  the  control  fluid, 
reaction  forces  are  generated  due  to  the  motion  of  the  fluid.  These 
forces are then transmitted to the junctions and couplings in the valve 
installation phase. The designer of the system is therefore responsible 
to  provide  appropriate  supports  to  correctly  withstand  the  dynamic 
forces generated.  
When  calculating  the  reaction  forces  with  gas,  refer  to  standard  API 
520-Part II (August 2003): 
 
 
 

 

 
 

Summary of Contents for VS/AM 58

Page 1: ...MT 302 I ENGLISH SAFETY VALVE VS AM 58 TECHNICAL MANUAL INSTRUCTIONS FOR INSTALLATION COMMISSIONING AND MAINTENANCE TECHNICAL M...

Page 2: ...e at the installation site or at least in accordance with EN 12186 or EN 12279 in particular paragraphs 6 2 7 5 2 7 7 and 9 3 of EN 12186 and 6 2 7 4 7 6 and 9 3 of EN 12279 must be adhered to Install...

Page 3: ...UIREMENTS _________________ 5 2 3 SPECIAL REQUIREMENTS __________________ 5 2 3 REACTION FORCES DUE TO DISCHARGE ______ 5 2 5 CONDITIONS OF USE ______________________6 2 6 INSTALLATION DIRECTLY ON LIN...

Page 4: ...Technical Manual MT 302 I 3 Figure 1...

Page 5: ...on the comparison between the thrust on the piston 4 deriving from the gas pressure to control and the thrust deriving from the setting spring 21 The weight of the mobile unit and the static and dyna...

Page 6: ...sure and the fluid contained in the system before carrying out any inspection and maintenance activities The pilot of the valve is sealed after being tested and calibrated the sealing is done in three...

Page 7: ...ss section Set press Calibration value Fluid Fluid Overpress Overpressure to which the declared Kd value refers Kdr declassified discharge coefficient In particular it draws attention to the following...

Page 8: ...PRESSURIZATION After installation check that the connections to the line have been carried out properly and that any relief and discharge valves on the system are closed and that the inlet outlet shu...

Page 9: ...fluid The state of cleanliness and conservation of the piping making up the system in general after the first start up of the plants they require more frequent maintenance for the precarious state of...

Page 10: ...the disassembly phase to correctly match all the connections and following the procedures described in the preceding paragraphs in reverse order 1 Reassemble the obturator guide obturator unit 2 Refi...

Page 11: ...ation of the valve When performing maintenance it is recommended to lubricate the moving parts obturator and seals with silicone grease 6 0 STORAGE The VS AM 58 valves do not require special precautio...

Page 12: ...Technical Manual MT 302 I 11 Type of valve Serial number Year of manufacture Type of fluid used Number of article Quantity...