The phyCORE-i.MX on the Carrier Board
©
PHYTEC Messtechnik GmbH 2011 L-710e_5
77
Table 29: UBS Host interface jumper settings for i.MX27 module
1
J
UMPER
S
ETTING
D
ESCRIPTION
JP13
open
closed
USB Host transceiver U26 is disabled, USB Host is out of operation
USB Host transceiver U26 is active, USB Host is in operation
JP6
open
closed
Reset pin is held HIGH, no Reset asserted
Reset pin is connected to GPIO, Reset can be asserted
JP42
1+2
2+3
USB Host is managed on the i.MX baseboard
USB Host is managed on the i.MX module
JP43
1+2
2+3
USB Host is managed on the i.MX baseboard
USB Host is managed on the i.MX module
JP44
open
closed
USB Host is managed on the i.MX module
USB Host is managed on the i.MX baseboard
JP45
1+2
2+3
USB Host is managed on the i.MX baseboard
USB Host is managed on the i.MX module
JP46
1+2
2+3
USB Host is managed on the i.MX baseboard
USB Host is managed on the i.MX module
Caution!
With the phyCORE-i.MX27 jumper JP6 and JP42 to JP46 always have to be set as described in the
table above. The alternative functions of this jumpers are not available for the i.MX27 module.
1
Settings for the phyCORE-i.MX27 USB-Host interface are in
bold blue
Summary of Contents for phyCORE-i.MX27
Page 34: ...phyCOREi MX27 26 PHYTEC Messtechnik GmbH 2011 L 710e_5 ...
Page 38: ...phyCOREi MX27 30 PHYTEC Messtechnik GmbH 2011 L 710e_5 ...
Page 52: ...phyCOREi MX27 44 PHYTEC Messtechnik GmbH 2011 L 710e_5 ...
Page 56: ...phyCOREi MX27 48 PHYTEC Messtechnik GmbH 2011 L 710e_5 ...
Page 94: ...phyCOREi MX27 86 PHYTEC Messtechnik GmbH 2011 L 710e_5 ...
Page 100: ...Published by PHYTEC Messtechnik GmbH 2011 Ordering No L 710e_5 Printed in Germany ...