LIFEPAK 20/20e Defibrillator/Monitor
Replacement Procedures
Boardstack
Assembly Diagram
Boardstack Removal
Boardstack Installation
A10 SpO2 Module
Removal
A10 SpO2 Module
Installation
OEM/PP PCB Removal
OEM/PP PCB Installation
A01 System PCB
Removal
A01 System PCB
Installation
139
135
265
A01
127
149 (x3)
A06
A10
161
A02
129 (x5)
252 (x4)
252
173 (x5)
125
221
255
(from Power Module)
258
278
W03 (from Bottom Case)
255
262
255
(x2)
173
(x2)
344
W05 (from Bottom Case)
9-63