Step 6:
Apply Pressure on the Building Plate
Once the building plate has touched down, apply pressure and press down firmly on the
sides of the building plate. Pull on the piece of paper to make sure the building plate is laying
tight against it.
Step 7:
Tighten the Screws in a Cross Pattern Order
Once you have successfully adjusted the building plate, tighten all four screws on the sides
of the building plate in a clockwise direction while pressing down on the building plate with
the other hand, in a cross pattern order, e.g., top-right, lower-left, top-left, and lower-right.
Step 8:
Double-Check Z-axis Calibration
Tug on all four corners of the A4 paper to check for pressure intensity. If it is tight, please
proceed onto the next step. If it isn’t, please perform the Z-axis calibration test again.