
Step 8:
Tighten the Screws in a Cross Pattern Order
Once you have successfully adjusted the building plate, tighten all four screws on the sides
of the building plate in a clockwise direction while pressing down on the building plate with
the other hand, in a cross pattern order, e.g., top-right, lower-left, top-left, and lower-right.
Step 9:
Double-Check Z-axis Calibration
Tug on all four corners of the A4 paper to check for pressure intensity. If it is tight, please
proceed onto the next step. If it isn’t, please perform the Z-axis calibration test again.
After several tries, if the paper is still loose, please perform the Z-axis Calibration test directly
on the resin vat. The FEP thickness is approximately 0.14-0.15 mm.