Phoenix SE951 Important Installation Instructions Download Page 5

Installation – 

Solid Floor

When the cement has set, make connection 

between the shower tray and waste piping. 

The shower tray and all connections MUST 

now be checked for water tightness, flow and 

adequate drainage over the entire area.

DO NOT PROCEED IF NOT SATISFIED.

After all checks and adjustments, tile and 

then seal along the tilling line with silicone 

sealant.

Fill in the access area and the waste pipe trench 

beneath the shower tray with cement to give full 

support to the shower tray when in service.

If fitting a shower enclosure refer to the manufac-

turers installation instructions.

Place the shower tray onto the wet cement 

ensuring that it is fully supported. Check the 

level of the top rims only as the shower tray has 

built-in fall for adequate drainage.

Remove any excess cement and allow to set 

fully before continuing.

Mix fine sand, cement and a cement additive 

in accordance with the manufacturers 

instructions to a workable mix to cover the 

total area under the tray. Trowel to a thick-

ness suitable to allow levelling and full 

support of the shower tray.

Note! Silicone sealants, foams, mastics, 

installation compound adhesive or similar 

MUST NOT be used as a substitute for 

cement.

7

8

5

6