60
61
62
Cut away the covering from the fuselage.
Install the landing gear.
Secure the landing gear.
63
64
65
Install the nose gear.
Secure the nose gear.
Attach the nose gear rod into the metal
connector and secure it.
5
52
53
54
Install the metal connector to the servo
arm.
Install the servor arm into the rudder
servo.
Cut away the rudder pushrod.
55
56
Bend "L" the rudder pushrod.
Attach the nylon clasp to the servo arm.
57
58
59
The landing gear and nose gear.
Install the collar.
Install the wheel.
Installing the landing gear and nose gear.
Installing the landing gear and nose gear.
6
Collar
Collar
Gear