background image

Process Data

1.

Click the 

Process

 button

○ Verify that the channels and references selected 

are the desired ones

2.

Define the time period by entering a start 
and end date/time 

3. Enable the electric power grid filter

 that 

corresponds to the frequency carried by the 
power lines in the survey region 

(50Hz, 60Hz 

or None)

4.

Click the 

Process

 button

5.

A live display of the resistivity curve will 
appear after a few seconds

 

*This resistivity curve is not saved.
 It is purely for QC purposes

13

1

2

3

4

5

Summary of Contents for MTU-5C

Page 1: ...Creator 4 Electric Channel Settings 5 Magnetic Channel Settings 6 Saving a Configuration File 7 MTU 5C Connections 8 SD Card Recording Data 9 Stopping a recording 10 Importing Field QC 11 Field QC 12...

Page 2: ...ectors E2 Ey electrode connectors 4 Ground electrode connector 5 12VDC power input 6 LAN connector 7 GPS antenna connector 8 H1 Hx magnetic sensor connector H2 Hy magnetic sensor connector H3 Hz magne...

Page 3: ...2 1 MT Configuration Creator Use the Calibration and System Test options as needed 3 Calibration 3 1 Sensor Calibration 3 2 Receiver Calibration No additional configuration needed 4 System tests 4 1 W...

Page 4: ...Shot Daily or Weekly and click Add Schedule to define the time and date 3 Channels Settings 4 Define the Receiver Settings Sampling Mode Sampling Rate 5 Live tool see the Networking Settings manual 6...

Page 5: ...Disable the channel s Disable the channel s If you do not plan to use them during the recording This will save space on the SD card 3 Complete the information in the Electric channel settings 2 5 Cha...

Page 6: ...ble the channel s Disable the channel s if you do not plan to use them during the recording This will save space on the SD card 3 Fill in the required information on the Magnetic channel settings 2 So...

Page 7: ...USB card reader 2 Click the File menu Save or Ctrl S Select the SD card EMpower will automatically create the file config json 3 Save the configuration file config json in the root folder of the SD c...

Page 8: ...1 Ex N S and channel E2 Ey E W 3 Magnetic sensors to channels H1 Hx H2 Hy and H3 Hz 4 GPS antenna 5 12V DC Power Source 6 Network connector In the field it is often most efficient to connect the compo...

Page 9: ...e Channel Detection Recording SD Recording 1 Insert the SD card and close the cap 2 To turn on the receiver press the Power button briefly wait until both LEDs are solid blue 2 1 LED pattern for Autom...

Page 10: ...ed SD 1 Press the Power button briefly and release to stop recording Wait until both LEDs are steady blue 2 Turn off the receiver by pressing the Power button for a few seconds until the LEDs will fla...

Page 11: ...button 2 Select View data 3 Select the SD card The recording creates two folders log and recdata 4 Open the recdata folder Select the recording file Click Choose Receiver Serial Number Recording Date...

Page 12: ...detected and make the necessary corrections Serial Polarity H1 H 3 Azimuth 3 View Recording Details see page 14 4 After reviewing the information Process the data see next page Field QC The warning i...

Page 13: ...a start and end date time 3 Enable the electric power grid filter that corresponds to the frequency carried by the power lines in the survey region 50Hz 60Hz or None 4 Click the Process button 5 A li...

Page 14: ...ity control 1 Battery Voltage 2 Internal Temperature 3 Number of Satellites 4 Saturated Frames If saturation is not close to 0 review the channel configuration see pages 4 6 the channel gain might be...

Page 15: ...Technical Support Contact 15 Please check out the FAQs https phoenixgeophysics freshdesk com Or email us at support phoenix geophysics com...

Reviews: