STANDARD MAINTENANCE
Service Schedule of Components
h:
Hours
❍
: Check
●
: Change
Deck
Periodic Service Schedule
Ref. No.
Part Name
1,000 h
2,000 h
3,000 h
4,000 h
B2
Cylinder Assembly
❍
●
❍
●
B3
Loading Motor Assembly
●
B8
Pulley Assembly
●
●
B27
Tension Lever Assembly
●
●
B31
AC Head Assembly
●
B32, B339
Reel (T), Reel (S)
●
B37
Capstan Motor
●
●
B52
Capstan Belt
●
●
*B73
FE Head CBA
●
B133
Idler Assembly
●
●
B410
Pinch Arm (A) Assembly
●
●
B414
Main Brake S Assembly
●
●
B416
Main Brake T Sub Assembly
●
●
B525
Loading Belt
●
●
Notes:
1. Clean all parts for the tape transport (Upper Drum with Video Head / Pinch Roller / Audio Control Head / Full
Erase Head) using 90% Isopropyl Alcohol.
2. After cleaning the parts, do all DECK ADJUSTMENTS.
3. For the reference numbers listed above, refer to Deck Exploded Views.
* B73 ------ VCR Model only
2-1-1
U21MENT
www.freeservicemanuals.info
06/28/2012
World of Free Manuals