• 19 •
16 When the rinsing water in the water
tank is fi nished, the "
" light starts
blinking.
17 Turn the selector dial to the " " posi-
tion.
Empty the container under the steam
wand and the one under the dispensing
spout.
Steady-on
18 When the "
" icon lights up steady
on the display, remove the water tank.
19 Remove the water tank, rinse it and
fi ll it up to the "MAX" level with fresh
drinking water.
20 Place the tank back in the machine.
Place an empty container under the
steam wand.
21 When the "
" button is lit up steady,
turn the selector dial clockwise to the
"
" position. The second rinse cycle
is started.
22 When the second rinse cycle is over,
the machine enters the stand-by mode
and the " " button starts blinking.
Empty the container under the steam
wand and the one under the dispensing
spout.
If the tank is not fi lled up to
the MAX level, the cycle must
be repeated from point 16.
23 Turn the selector dial to the " " posi-
tion.
24 At the end, refi ll the water tank.
Reassemble the external part of the Pan-
narello.
The descaling cycle is complete.
Start the machine as described in the
manual and perform normal warm-up
and rinse operations: the machine is now
ready for product brewing.
If the machine is switched off
during the descaling cycle,
next time the machine is switched
on the cycle must be repeated from
the point it has been paused.