1. 

INSTALL FOUR (4) 3/8" X 9" X 1-1/2" ANCHOR BOLTS 
INTO CONCRETE FOUNDATION (BY OTHERS) UTILIZ-
ING TEMPLATE PROVIDED, (SEE BASE DETAIL ON 
PAGE 4). ENSURE ANCHOR BOLTS PROJECT 1-1/2" 
ABOVE CONCRETE SURFACE. CONDUIT PROJEC-
TION TO BE 1-1/2" MAXIMUM (BY OTHERS).

 

2. 

REMOVE LUMINAIRE FROM SHIPPING CARTON. UN-
SCREW (4) 5/16-18 X 3/4” HEX HEAD SCREWS FROM 
BASE OF BOLLARD SHAFT TO DETACH THE AN-
CHOR BASE.

 

3. 

PLACE BOLLARD ANCHOR BASE ONTO THE FOUR 
PREINSTALLED ANCHOR BOLTS. INSTALL FOUR (4) 
3/8” LOCKWASHERS AND FOUR (4) 3/8-16 LOCK-
NUTS. SECURE ANCHOR BASE IN POSITION BY 
TIGHTENING LOCKNUTS 20 FT-LBS OF TORQUE.

 

4. 

MAKE ELECTRICAL CONNECTIONS. FIXTURE LINE 
(BLACK) TO SUPPLY LINE, FIXTURE COMMON 
(WHITE) TO SUPPLY COMMON AND GROUND 
(GREEN) TO GROUND.

 

5. 

PLACE SPLICES AND EXCESS WIRE IN BOLLARD 
SHAFT. BE SURE TO NOT PINCH WIRES. CAREFUL-
LY SET BOLLARD UPRIGHT ON ANCHOR BASE.

 

6. 

ALIGN SCREW HOLES ON SHAFT WITH ANCHOR 
BASE AND SCREW IN THE FOUR 5/16-18 X 3/4” HEX 
HEAD SCREWS THAT WERE REMOVED IN STEP 2. 
TIGHTEN TO 10 FT-LBS OF TORQUE.

 

STANDARD INSTALLATION 

NOTE: ANCHOR BASE IS SECURED TO GROUND WITH 3/8” BOLTS (BY OTHERS).  STRUCTURAL MEMBERS MUST BE 
PRESENT IN GROUND TO ACCEPT BOLLARD BASE. SOME COMPONENTS SEEN IN VIEW MAYBE DIFFERENT FROM 
THE PRODUCT RECEIVED. LUMINAIRE WILL STILL BE INSTALLED THE SAME AS SHOWN IN INSTRUCTION SHEET. 

1-1/2” CONDUIT 

4X 3/8"X9"X1-1/2"  

ANCHOR BOLTS 

(BY OTHERS)

 

4X 5/16-18 X 3/4” HEX 

HEAD SCREWS  

(SUPPLIED)

 

4X 3/8” LOCKWASHERS 

& 3/8-16 LOCKNUTS 

(BY OTHERS)

 

ANCHOR BASE 

BOLLARD SHAFT 

CONCRETE 

FOUNDATION 

(BY OTHERS) 

SUPPLY LEADS 

LUMINAIRE 

INPUT LEADS 

Summary of Contents for PureForm

Page 1: ...ge and or miss ing parts upon arrival of the luminaire please contact SanMarcos TSC philips co phone 800 227 0758 These instruc ons do not purport to cover all details or varia ons in equipment nor to provide every possible con ngency to meet in connec on with instal la on opera on or maintenance Should further informa on be desired or should par cular problems arise which are not covered sufficient...

Page 2: ...QUE 4 MAKE ELECTRICAL CONNECTIONS FIXTURE LINE BLACK TO SUPPLY LINE FIXTURE COMMON WHITE TO SUPPLY COMMON AND GROUND GREEN TO GROUND 5 PLACE SPLICES AND EXCESS WIRE IN BOLLARD SHAFT BE SURE TO NOT PINCH WIRES CAREFUL LY SET BOLLARD UPRIGHT ON ANCHOR BASE 6 ALIGN SCREW HOLES ON SHAFT WITH ANCHOR BASE AND SCREW IN THE FOUR 5 16 18 X 3 4 HEX HEAD SCREWS THAT WERE REMOVED IN STEP 2 TIGHTEN TO 10 FT LB...

Page 3: ... SURE NOT TO PINCH ANY WIRES 4 ALIGN SCREW HOLES ON YOKE GAS KET AND SHAFT TIGHTEN THE TWO 1 4 20x5 8 HEX HEAD SCREWS THAT WERE REMOVED IN STEP 1 TO 10 FT LBS 5 ONCE LUMIANIRE IS POWERED ON EN SURE THAT TEST INDICATOR LIGHT TURNS ON FOR A SHORT TIME TEST 30 SEC LET THE UNIT CHARGE FOR AT LEAST AN HOUR BEFORE PRESSING EMERGENCY BUTTON TO ENSURE BOLLARD CAN SWITCH OVER TO EMERGENCY BATTERY POWER EME...

Page 4: ...Philips Lighting Canada Ltd Corporation 281 Hillmount Road 200 Franklin Square Drive Markham ON Canada L6C 2S3 Somerset NJ 08873 USA 2018 Philips Lighting Holding B V All rights reserved www philips com luminaires P N 443560819190 Rev A Page 4 of 4 ANCHOR BASE TEMPLATE 1 1 SCALE ...

Reviews: