22BDL7324L
v
This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not
cause harmful interference, and (2) this device must accept any interference received, including interference that may cause
undesired operation.
Envision Peripherals Inc.
490 N McCarthy Blvd, Suite #120
Milpitas, CA 95035
USA
Polish Center for Testing and Certification Notice
The equipment should draw power from a socket with an attached protection circuit (a three-prong socket). All equipment that
works together (computer, display, printer, and so on) should have the same power supply source.
The phasing conductor of the room’s electrical installation should have a reserve short-circuit protection device in the form of a
fuse with a nominal value no larger than 16 amperes (A).
To completely switch off the equipment, the power supply cable must be removed from the power supply socket, which should
be located near the equipment and easily accessible.
A protection mark “B” confirms that the equipment is in compliance with the protection usage requirements of standards PN-
93/T-42107 and PN-89/E-06251.
Electric, Magnetic and Electromagnetic Fields (“EMF”)
1. We manufacture and sell many products targeted at consumers, which, like any electronic apparatus, in general have the
ability to emit and receive electromagnetic signals.
2. One of our leading Business Principles is to take all necessary health and safety measures for our products, to comply with
all applicable legal requirements and to stay well within the EMF standards applicable at the time of producing the products.
3. We are committed to develop, produce and market products that cause no adverse health effects.
4. We confirm that if its products are handled properly for their intended use, they are safe to use according to scientific
evidence available today.
5. We play an active role in the development of international EMF and safety standards, enabling us to anticipate further
developments in standardization for early integration in its products.
Summary of Contents for L Line 22BDL7324L
Page 1: ...www philips com welcome User Manual English Professional Display Solutions L Line 22BDL7324L ...
Page 18: ...22BDL7324L 7 Step 3 Repeat step 2 until all cabinets are mounted onto the bracket ...
Page 25: ...22BDL7324L 14 7 After the update is complete click OK See Figure 1 7 Figure 1 7 ...
Page 38: ...22BDL7324L 27 Appendix E Power Data cable measure Installation power cable measure ...
Page 40: ...22BDL7324L 29 Installation data cable measure ...