GC8080
BACKPLATE SPRAYED 1
SWIVEL PLATFORM 2
BALL SWIVEL 3
HOSE-CORD ASSY 4
Remove
Screw A
Disassemble
BACKPLATE
SPRAYED
1
Remove
Screw B (2 x)
Disassemble
Cord clamp
Disassemble
Connections
Disassemble
Black hose
BRACKET-INLAY 5
RUBBER TRIGGER 6
TRIGGER 7
ELECTRONIC
CONTROLLER 8
RUBBER LCD 9
TEMPERATURE BUTTON
PRINTED 10
MODE BUTTON 11
DISPLAY CAP ASSY 12
INLAY 13
Remove
Screw C
Disassemble
BRACKET-INLAY 5
Disassemble
INLAY 13
Remove
Screw D (2 x)
Remove
Screw E2, E3
Disassemble
ELECTRONIC
CONTROLLER
8
DISASSEMBLY ADVICE - IRON
OPTIONAL (accessories)
- No specific issues
HANDLE PRINTED 14
BUNG1 15
BUNG2 16
TUBE COUPLING 17
HOSE CLAMP 18
IRON COVER SPRAYED 19
THERMISTER ASSY 20
SOLEPLATE ASSY 21
Remove
Screw E (3 x)
Disassemble
HANDLE
PRINTED
14
Disassemble
red hose from catches
on IRON COVER
SPRAYED
19
Disassemble
HOSE CLAMP 18
Disassemble
TUBE COUPLING 17
Remove
Screw F (3 x)
Disassemble
IRON COVER
SPRAYED
19
Remove
Screw G
Disassemble
THERMISTER
ASSY
20
REPAIR INSTRUCTIONS
- When replacing the
THERMISTER
ASSY 20
, 22 kgf-cm torque is
required to secure screw G.
This amount of torque will ensure
the thermister give accurate readings.
- Please refer to the following picture
for wire dressing at the back of the
iron.
Light
blue
Yellow/
Green
Black
Red
Dark
Blue
Brown
STAND
IRON
Electro-
valve
Pressure
Lamp
F
N
Boiler
Elec-
tronics
Boiler
Switch
Thermal
Fuse
Thermistor
-t˚
Pump
P
N
L
E
M
Level
Sensor
S
Pump
Safety
Thermostat
Water
Level
Lamp
Boiler
Heating
Element
Reed
Switch
Pressostat
Boiler
Safety
Thermostat
Heating
Element
L
S
N
L
S
N
Th
Lout
Electronic
Controller
2-6