2 - 2
2 - 2
f) The set will shut down automatically when the software upgrade
is completed.
6)How to replace the defective Blu-ray Loader
a) Remove the defective Blu-ray Loader.
b) Remove the shield cover at the top of Blu-ray Loader as shown
below.
c) Assembly Blu-ray Loader to “J800”,”J900”,”J905” on the top of
BD Board as shown below.
d) Remove soldered joint on the ESD protection points.
Note: The 2 ESD protection points on any one side must be
soldered if
o the Blu-ray Loader is OK and needs to be disconnected
from connector J800, J900 and J905 of the BD Board.
o the defective Blu-ray Loader is needed to be send back to
supplier for failure analysis and to support backcharging evidence.
K911
K:11
K:16
Top side view of OPU
Bottom side view of OPU
The ESD protection points
on the top of board
CAUTION!
This information is confi dential and may not be
distributed.Only a qualifi ed service person should
reprogram the Region Code.
Software upgrade will take 5 minutes
Do not switch off!
Package version: 000025.0
Software BE Completed
Software FE Completed
Software MCU1: Not started
Software Dock: 2%
Software MCU3: Not started
Software upgrade will take 5 minutes
Do not switch off!
Package version: 000025.0
Software BE Completed
Software FE Completed
Software MCU1: 1%
Software Dock: Failed
Software MCU3:
The ESD protection points
on the top of board
Summary of Contents for HTS7202/12
Page 15: ...4 1 4 1 BLOCK DIAGRAM ...
Page 16: ...4 2 4 2 WIRING DIAGRAM V1 V2 V3 V4 V5 V6 V7 V1 V8 ˣˢ ʳ ˢ ʳ V9 ʳ ˢ ʳ ...
Page 19: ...5 3 5 3 1 TV HDMI 2 HOME THEATER 3 HOME THEATER 3 1 2 1 2 1 2 3 ...
Page 20: ...5 4 5 4 3 DOCK for iPod 1 2 TV TV HOME THEATER 1 2 ...
Page 31: ...8 3 8 3 Waveforms for measure point qjo4 qjo3 ...
Page 33: ...9 1 9 1 TOUCH BOARD TABLE OF CONTENTS Circuit Diagram 9 2 PCB Layout Top Bottom View 9 3 ...