background image

HD7892/60 /61

9-15

Parts list

Pos

Service code

Description

Remark

1720

Lid spring

1730

Hose

1740

Lever

Deep black

1750

Lever frame

1760

Rod (2x)

1770

Slider left

1780

Slider right

1790

Slider spring

17100

Lid frame

17110

4222 240 05991

Ejector pin (2x)

17120

4222 247 08121

BC seal

17130

4222 247 72611

Distribution disk

17140

Brewchamber bottom

Black

18

4222 247 72573

Inner frame

19

4222 259 65982

Main PCBA  SENSEO Switch

220 - 240 V

20

4222 247 08101

L-bend

21

4222 240 02041

Hose clamp

22

4222 259 61291

Pressure hose assy

23

4222 247 75502

Base plate

Fusion black

24

4222 247 69442

Suspension bracket

25

4222 244 50693

Tie wrap boiler

26

4222 259 37244

Pump  ULKA HF

230 V ˜50 Hz

27

4222 247 43690

Boiler pin cover

28

Hose valve assy

29

4222 247 69552

TCO cover

30

Boiler assy TCO

Metal - 230 V

3010

4222 259 53272

Boiler

Metal - 230 V

3020

4222 247 05134

O-ring  (NTC)

3030

4222 240 00892

Bracket

3040

4222 259 60501

NTC

3050

4222 248 56582

Screw

3060

4222 248 56001

TCO

31

4222 247 08252

Hose socket

32

4213 247 05256

Foot

33

4222 247 06301

Pump damper

100

4222 244 50680

Tie wrap

Summary of Contents for HD7892/60

Page 1: ...130 mm Pump pressure 1 bar Brewing time for a jug 8 5 min Dimensions W x D x H º Packaging 466 x 242 x 322 mm º Product 150 x 400 x 270 mm Weight º Incl packaging 2 4 kg º Product 1 75 kg Materials º Podholder Stainless steel º Podholder handle PP º Top collector Podholder spouts POM º Housing Driptray cover Back plate ABS º Water container SAN º Water container lid Driptray PP º Brewchamber botto...

Page 2: ...2 ml 74 C 76 C French version 100 ml 69 C 73 C Measured in full Jug 7 cups 80 C Measurement specification Water spec without pod in mL Western Europe ml French ml 1 cup with 1 cup pod holder 133 10 109 10 2 cup with 1 cup pod holder 266 20 218 20 Electical diagram P NTC Fuse Fuse TCO Water level sensor N E L Boiler Pump UI PCBA Main PCBA t Functional diagram Boiler Pump 1 way valve Brew head g h e...

Page 3: ...undo them with a small flathead screwdriver No 0 The top cover needs to be tilted forward to be removed The flat cable W from the main PCBA to the UI PCBA is still attached to the User Interface panel and can easily be unplugged The brew chamber can now be removed by unscrewing the two screws C T15 and undoing the hose connection g from the one way valve 2 To reach internal components like Boiler ...

Page 4: ...hrough the guide on the inside of the housing and the water level sensor still connected to the inside of the housing You can now access the Boiler and Pump to remove them undo the electrical connections and hoses and reinstall in the reverse order Any Ty wrap that has been removed needs to be replaced by a new one and tightened with the specified forces 3 To replace the PCBA 3 1 Unscrew the inner...

Page 5: ...no country selection option therefore adjust both 1 cup 2 cup recipes within the right volumes following the table page 2 For the correct procedure on Volume measurement please refer to the SENSEO Repair process How to adjust the volume output 1 cup 1 Make sure the boiler is filled properly otherwise perform the Flush before first use procedure according to the instructions in the DFU 2 Make sure ...

Page 6: ... cup buttons to store the calibration value The 1 cup and 2 cup LEDs blink rapidly 3 times You enter automatically the 2 cup pump time adjusting step 1 cup and 2 cup buttons are on 5 2 cup adjustment a Press and release the 1 cup button to decrease the calibration value The 1 cup and 2 cup LEDs blink one time b Press and release the 2 cup button to increase the calibration value The 1 cup and 2 cu...

Page 7: ...t temperature sensor and descale LED a Press the 1 cup button and hold it b The descale LED turns on Other LEDs and the heater are off c If the temperature sensor is connected and has the right value approx 1 5 kOhm the pump turns on d Disconnect the temperature sensor and the pump turns off e Release the 1 cup button CALC LED remain on 5 Test step 5 Test water level sensor a Press the 2 cup butto...

Page 8: ...k 8 9965 100 70806 Thermal jug lid Black 9 4222 247 75141 Coffee spoon 10 4222 259 65932 Water container assy incl Lid Deep black 1010 Water container lid Deep black 1020 Valve seal 1030 Valve spring 1040 Valve rod 1050 Float spring 1060 Float assy 1070 Water container Transparent 11 4222 259 60072 One way valve 12 4222 247 75522 Housing Deep black 13 4222 247 59473 Sensor housing 14 4222 259 6590...

Page 9: ...2 247 08101 L bend 21 4222 240 02041 Hose clamp 22 4222 259 61291 Pressure hose assy 23 4222 247 75502 Base plate Fusion black 24 4222 247 69442 Suspension bracket 25 4222 244 50693 Tie wrap boiler 26 4222 259 37244 Pump ULKA HF 230 V 50 Hz 27 4222 247 43690 Boiler pin cover 28 Hose valve assy 29 4222 247 69552 TCO cover 30 Boiler assy TCO Metal 230 V 3010 4222 259 53272 Boiler Metal 230 V 3020 42...

Page 10: ...HD7892 60 61 10 15 110 120 3 4 5 210 220 1 2 Exploded view ...

Page 11: ...HD7892 60 61 11 15 8 9 6 7 610 620 Exploded view ...

Page 12: ...HD7892 60 61 12 15 1060 1050 1030 1020 1070 1040 10 1010 Exploded view ...

Page 13: ...HD7892 60 61 13 15 a B A g C C W g f V 13 11 1460 1420 1430 1440 1450 1410 14 1530 1510 1520 15 12 Exploded view ...

Page 14: ...HD7892 60 61 14 15 h g 1790 1770 1750 1760 2x 1780 1720 1710 17120 17130 17140 1730 1740 16 17100 17 17110 2x Exploded view ...

Page 15: ...HD7892 60 61 15 15 U W V Y X 19 20 21 22 23 Restrictor D Z D 18 26 c b a Z Y X 31 33 2x 32 4x d e f U 28 29 27 2x 3060 3050 3020 3010 30 3040 3030 24 25 Exploded view ...

Reviews: