Départ. Technical support- CM640
PROCEDURE
COMPANY RESTRICTED
PHILIPS Consumer
Communications
Centre du Mans
Service Repair Support
VY-V-640-204
Page : 5 of 42
Langue : EN
Date : 09/21/01
PHILIPS ELECTRONICS N.V. 1999
VY-V-640-204
All rights reserved. Reproduction in whole
or in part is prohibited without the written
consent of the copyright owner.
6.0 TEST AND INPECTION PLAN
The test plan is derived from the Product Test Reference of FISIO 311.
6.1
User Interface Test
Use the Test SIM Card « SP »/ Production to test the transceivers as follows :
•
On/Off button
•
LCD Backlight
•
Keyboard Test
•
Buzzer Test
•
Vibrator Test
•
Audio Test
•
Antenna
Test ( to measure the radiated power level. Not necessary when using an antenna coupler)
•
LCD
•
IMEI
•
Tester Status/Eeprom Status
With a fast Charger connected with the PRODUCT’s bottom connector , check the full scrolling from one mode to
the next when charging IGN (Ignition) – Battery.
6.2
RF Test
The radio test must be performed with a Digital Radio Test Set. The mobile has to be set on the antenna coupler
inside the shielded chamber.