
2-1-1
U29PMEN
STANDARD MAINTENANCE
Service Schedule of Components
This maintenance chart shows you the standard of replacement and cleaning time for each part.
Because those may replace depending on environment and purpose for use, use the chart for reference.
Notes:
1.Clean all parts for the tape transport (Upper Drum with Video Head / Pinch Roller / ACE Head / FE Head) using
90% lsopropyl Alcohol.
2.After cleaning the parts, do all DECK ADJUSTMENTS.
3.For the reference numbers listed above, refer to Deck Exploded Views.
h: Hours
: Cleaning
I
: Replace
Deck
Periodic Service Schedule
Ref.No.
Part Name
1,000 h
2,000 h
3,000 h
4,000 h
B2
Cylinder Assembly
I
I
B3
Loading Motor Assembly
I
B8
Pulley Assembly
I
I
B587
Tension Lever Assembly
I
I
B31
ACE Head Assembly
I
B573, B574
Reel (SP)(D2), Reel (TU)(D2)
I
B37
Capstan Motor
I
I
B52
Cap Belt
I
I
B73
FE Head
I
B133, B134
Idler Gear, Idler Arm
I
I
B410
Pinch Arm(A) Assembly
I
I
B414
M Brake (SP) Assembly
I
I
B416
M Brake (TU) Assembly
I
I
B525
LDG Belt
I
I
B569
(2 head only)
Cam Holder
I
I
B593
(4 head,
4 head HiFi
only)
Cam Holder Assembly
I
I
Summary of Contents for DVP620VR/78
Page 12: ...1 6 1 H9622IB OPERATING CONTROLS AND FUNCTIONS ...
Page 13: ...1 6 2 H9622IB ...
Page 14: ...1 6 3 H9622IB ...
Page 15: ...1 6 4 H9622IB ...
Page 16: ...1 6 5 H9622IB ...
Page 17: ...1 6 6 H9622IB ...
Page 73: ...1 19 3 H9622PEX Packing Q U I C K S2 S2 S2 S2 S1 Unit S3 A14 X4 X20 X5 X2 X3 X17 X1 ...
Page 92: ...2 4 9 U29PDA Fig DM16 43 41 42 Slide Plate S 11 L 13 Fig DM17 44 45 Slide ...