INSTALLATION INSTRUCTIONS

BL25 BOLLARD SERIES

, and 

equipment. 

 

   

ELECTRICAL SHOCK HAZARD

READ, UNDERSTAND, and FOLLOW

 

these instructions before installing

 

equipment.

 

Disconnect the electrical supply power at the service panel (fuse or circuit breaker box). 
Failure to do so could result in serious injury or death. Only qualified electricians should install 
this fixture and the installation MUST conform with the National Electrical Code and all 
applicable local codes and ordinances. Ensure that only proper tools, materials, and 
equipment are used during installation.

WARNING

 

SAFETY

Proper grounding is required to ensure personal safety.
Do not use this equipment for anything other than its intended purpose.
Servicing this equipment should be performed by qualified service personnel.
Installer must assure installation including integrity of anchor bolts,foundation 

and tightening of anchor nuts.
Make sure all four set screws supplied to attach bollard to the base plate are 

installed and completely tight.

 

Save these instructions 

Concrete

Foundation

(3) Anchor J-Bolts

Wiring Conduit 

(By Others)

(3) Sets of Leveling 

Washers & Nuts

3”[76.2mm]

6”[152.4mm]

 Base plate 

(3) Sets of Locking 

Washers & Nuts

ANCHOR BOLT INSTALLATION

CAUTION:

 

Install according to all applicable local codes.

 

Install three (3) Anchor J-Bolts in concrete foundation (by    
others) using the template provided. Bollard Base may also 
be used as the template. Bolt threads should protrude at least 
3” from concrete.

BOLLARD INSTALLATION

To allow for base plate leveling, before inserting base plate, 
place one nut followed by a washer onto each Anchor J-Bolt.
Place Base Plate over anchor J-bolts  and leveling nuts.
Loosely tighten flat washers and nuts  onto J-bolts.
Level base plate by adjusting the leveling nuts under the base 
plate.Then tighten the upper nuts on top of the base plate.
Secure wires above ground level. 

Make appropriate wiring connections as per

 

instructions below.

Place fixture over the base plate.
Secure bollard onto the base plate by progressively tightening 
the four set screws  at the bottom of the column.

 

(3) Anchor J-Bolts

Concrete

Foundation

Wiring 

Conduit 

(By Others)

(4)  Set Screws

(3) Sets of Locking 

Washers & Nuts

(3) Sets of 

Leveling Washers 

Base Plate

1

FIXTURE IS SUITABLE FOR WET LOCATIONS

ø8" [ø203.2 mm]

42’’[1066.8mm]

Installer must assure that all gaskets provided to seal the optical 

section of the bollard are in place and not damaged during assembly. 

The gaskets keep out insects and keep moisture from entering and 

collecting on the lens. 

200 Franklin Square Drive,              Markham ON, Canada L6C 2S3

Somerset, NJ 08873, USA

If required, retighten the four set screws that assembles the 

bollard head to shaft and secure appropriately.